This is problem 1-13 12. Draw a section ofa P&ID diagram for a vessel receiving a...
Problem 13 f 1144 - + 80% A standard method for instrumenting a control valve is termed the "double block and bleed." which is illustrated in Figure P113. Figure P1.13 Double Block and Bleed Arrangement for Problem 13 globe valve control valve valve valve 13. cteinical sewer laced Answer the
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...