Find the work done by the force field F(x, y,2)= <2ay - :, x° +23, 2y-2x...
8. Find the work done by the force field F(x, y) = 3i + (2y)j on a particle moving along the line segment that runs from (1,3) to (3,9).
Find the work done by the force field F(x, y, z) = (x – y, x + z, y + z) in moving a particle along the line segment from (0,0,1) to (2, 1, 0).
Calculate the work done by the force F= (x-2y)i+(x+y)j in a) 2. moving from point A at (0,2) to point B at (2,18) along the path y 4x2+2. [5 marks] - Evaluate the line integral(xdy+ydx) along a path C that is b) [5 marks] to t described by x= cos(f), y=2sin(t)+5, from t =: 2
Calculate the work done by the force F= (x-2y)i+(x+y)j in a) 2. moving from point A at (0,2) to point B at (2,18) along the...
0/5 points I Previous Answers My Compute the work done by the force F (sin(, y, in moving an object along the trajectory that is the line segment from (1, 1, ) to (2, 2, 2) followed by the line segment from (2,2, 2) to (-3, 6, 5) when force is measured in Newtons and distance in meters. Submit Answer
0/5 points I Previous Answers My Compute the work done by the force F (sin(, y, in moving an object...
Calculate the work done by the force field F on an object moving along a curve from P(-3, 3) to 217,8). F(x, y) 2x у 12 X Need Help? Read It Master It Talk to a Tutor
l.a. FinD F SUCH THAT F=of IF F = {2xy-2x+ 22, 2y-2x2) b. FIND THE WORK DONE UNDER IN MOVING A BODY FROM (-3,-2-) TO (1,2,3)
Find the work done by the force field F in
moving an object from P(-5, 5) to Q(1,
3).
Find the work done by the force field F in moving an object from P(-5, 5) to Q(1, 3). F(x, y) = 24 - -16/3
Calculate the work done by the vector field F?(x, y?)= ?(4xy, 2x^2) ? along a smooth and simple curve from point (?3, −1)? to point (?4,2)?.
D Question 11 12 pts to Consider the vector field F (x, y, z) =< 2x – yz, 2y – az,2z – xy>. a) (3) Is this vector field conservative? Justify your answer. b) (9) Find the amount of work done by this vector field in moving a particle along the curve (t) =< 3cost, cos’t, cos” (2t) > from t = 0 tot = 1
HELP
Calculate the work done by the force field F on an object moving along a curve from P(-5, 1) to Q(7,2). F(x, y) =