If you have any questions please let me know
Thank you
Please give me thumb up
0/5 points I Previous Answers My Compute the work done by the force F (sin(, y, in moving an obje...
ху, x22 compute the work done by the torce F meters. sin х у in mov ng an o ect along the trajectory that is the line segment from 1 1 1) to 2, ži til ed by the ine se me trom Z to 5) when or e me sure i N tons and distance in 73 1 12 2 ху, x22 compute the work done by the torce F meters. sin х у in mov ng an o...
Find the work done by the force field F(x, y,2)= <2ay - :, x° +23, 2y-2x > in moving an object from point A(-3,-2,-1) to point B(1,2,3) along the following paths: a line segment followed by the arch of a cycloid, followed by the top half of a parabola, and followed by another line segment at the end. Evaluate for full credit. (9 pts)
Find the work done by a force F = 8i - 6j + 5k that moves an object from the point (0, 8, 8) to the point (4, 16, 24) along a straight line. The distance is measured in meters and the force in newtons. 3
Find the work done by a force F-1-1+ 7k that moves an object from the point (0, 10, 6) to the point (6, 14, 24) along a straight line. The distance is measured in meters and the force in newtons.
Find the work done by a force + = 4î - 6j + 7ſ that moves an object from the point (0, 10, 8) to the point (6, 16, 22) along a straight line. The distance is measured in meters and the force in newtons. a. b. C. 88J 78) 84) 86] 85) d. e.
A constant force F=6i+8j?6k moves an object along a straight line from point (6, 0, -10) to point (-6, 7, 2).Find the work done if the distance is measured in meters and the magnitude of the force is measured in newtons.
Find the work done by the force field F(x, y, z) = (x – y, x + z, y + z) in moving a particle along the line segment from (0,0,1) to (2, 1, 0).
Find the work done by the force field F in moving an object from P(-5, 5) to Q(1, 3). Find the work done by the force field F in moving an object from P(-5, 5) to Q(1, 3). F(x, y) = 24 - -16/3
с 1. Determine the work done by force F along the path C, that is, compute the line integral F.dr from point A to point B. You need to find the parameterization of the curve C and use it to find the line integral: Work = ff.dr =[F(F(t)). 7"(t)dt с с Use F = (-y)ỉ +(x)ì in Newtons. and use a = 4 and b = 5 meters in the figure. Parameterization of a straight line: Remember that for any...
HELP Calculate the work done by the force field F on an object moving along a curve from P(-5, 1) to Q(7,2). F(x, y) =