QUESTION:2
PLEASE MAKE SURE NO MISTAKES ARE MADE IN THE CALCULATIONS.
Assume two-dimensional flow and complete...
Assume two-dimensional flow and complete the flow net in Fig 1 and compute: a) rate of flow in cubic meter/day if the spillway is 15 m wide b) pore water pressure at point A c) Compute and plot the distribution of pore water pressure at the base of the concrete spillway (.e. along the line C-D) If necessary, assume a suitable value for a parameter not given and dearly state it. (Hint: set Datum at the level of Tall Water) (40 marks) Concrete Spillway Tail Water I 1.5 m 1 1.5 m 3.5 m k = 1.2x10 m/sec Impervious Boundary