Question

15, what is the percentage of the specification band that the process uses up (a) 10% (h) 50% (c) 67% (d) 83% (e) 100% tinstr

0 0
Add a comment Improve this question Transcribed image text
Answer #1

The percentages of the specification band used by any process is calculated by the following formula,
statistical-quality-control-questions-answers-process-capability-ratios-1-q9a

= 100/1.5 = 66.6666

67%

Add a comment
Know the answer?
Add Answer to:
15, what is the percentage of the specification band that the process uses up (a) 10%...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • q22 , 26 , 30 16. If the specification limits are 2.230 to 2.250, 2.238, and...

    q22 , 26 , 30 16. If the specification limits are 2.230 to 2.250, 2.238, and s 0065, what percentage of the measurements would be out of specification? 22. If a population of measurements has a mean of2.45 inches and a standard deviation of.15 inches, a. Find the μ ± 3σ spread of measurements. b. What percentage of the measurements will lie within the values found in part (a)? c. If samples of size n 5 are taken from the...

  • Solve 7,10,11,12 in business stat 2430 Name: The mayors office wants to know how people in...

    Solve 7,10,11,12 in business stat 2430 Name: The mayors office wants to know how people in the city feel about the condition of the city's roads. They place an announcement in the newspaper asking residents to email their opinions to the mayor's office. Five hundred people send e als and about 84% of the responses indicate displeasure with the condition of the city's roads A) This is a simple random sample. It gives very accurate results B) This is a...

  • Please confirm the answers 35 to 41 from the below sample papers 35, Sources of variation in measurement data include a Part variation. b. Measurement c. Operator variatiorn C. All of the above. 36....

    Please confirm the answers 35 to 41 from the below sample papers 35, Sources of variation in measurement data include a Part variation. b. Measurement c. Operator variatiorn C. All of the above. 36. The variation in the average of measurements made by different appraisers using the same gage messuring a characteristic on one part is known as Reproducibility Repeatability c. GRR d. Measurement variation None of the above. e. 37. Using a target analogy for precision and bias, the...

  • 6) For the process to be capable of meeting design specifications the process capability index must...

    6) For the process to be capable of meeting design specifications the process capability index must be a- less than one (1.0) b- greater than one (1.0) c less than zero (0.0) d- greater than zero (0.0) 7) We are monitoring a process that has an outcome that is normally distributed with a mean of 100 and a standard deviation of 10. We would use a (n)----- -- to evaluate whether this process's average is remaining in control. a- x-bar...

  • QUESTION 15 Let X be a nonnegative random variable (the possible values of X are all...

    QUESTION 15 Let X be a nonnegative random variable (the possible values of X are all nonnegative numbers), and suppose  E( X ) = 1, then, the probability that X takes a value greater than 5, cannot be A. larger than 0.1. B. larger than 0.2. C. less than 0.2. D. none of the above. QUESTION 16 Let X be any random variable, and E( X ) = 2, then, the probability that X takes a value greater than 10, cannot...

  • NEED HELP ASAP - will give thumbs up Multi part question set If you can’t finish...

    NEED HELP ASAP - will give thumbs up Multi part question set If you can’t finish all of it, that’s ok! Would really appreciate any and all help as soon as possible Thank you so much in advance! This is the first of five multiple choice questions. pdf of Ô #1 e, ê sample value of Ô E[0] Refer to the graph above. The bias of Ô is and the sampling error is negative; positive negative; negative O positive; negative...

  • Please solve each subpart. 10. A process is made up of six activities with the following...

    Please solve each subpart. 10. A process is made up of six activities with the following task times: Activity A 4 minutes 6 minutes 16 minutes 5 minutes | 7 minutes 2 minutes Daily available production time is 480 minutes with a daily demand of 60 units. a. Calculate the takt time for this process. Interpret. b. Based on this take time and the activity times provided, what is the minimum number of stations needed for this process? c. Create...

  • What delineates low mass stars from high mass stars? A. Low mass stars are less than...

    What delineates low mass stars from high mass stars? A. Low mass stars are less than 10 times the size of the Sun. High mass stars are more than 10 times the mass of the Sun. B. Low mass stars are less massive than the Sun. High mass stars are more massive than the Sun. C. Low mass stars are less than 8 solar masses. High mass stars are greater than 8 solar masses. D. Low mass stars are smaller...

  • 2. Suppose your instructor uses a red helium-neon laser ( 632.8 nm in air) to illuminate...

    2. Suppose your instructor uses a red helium-neon laser ( 632.8 nm in air) to illuminate two parallel vertical slits much narrower than their separation distance, so ignore any single-slit diff metal foil. The very narrow slits are spaced 0.10 mm apart. (Assume that the slits themselves are raction effects that would result from each slit individually.) a.(3 pts.) If the central (0th-order) maximumn is located at&-o., what is the angular position θ, in degrees, of the T'"-order, 2 -order,...

  • 3. No-fines conerete, made from a uniformly graded coarse aggregate and a cement-water paste, is beneficial...

    3. No-fines conerete, made from a uniformly graded coarse aggregate and a cement-water paste, is beneficial in areas prone to excessive rainfall because of its excellent drainage properties. The article "Pavement Thickness for No-Fines Concrete Parking Lots" (J. of Transportation Engr., 1995: 476-484) evaluated the relationship between Y = porosity (%) and X unit weight (lb/ft) in concrete specimens. Summary data resulting from the study is provided below - - = -471.5 lb/ft2-% n 15 =1640.1 lb/ft SK6.1 lb/ft i=1...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT