Calculate the productivity index (PI) for a well producing under semi-steady state flow condition with following...
Exercise 3 An oil well in the X Field is producing at a stabilized rate of 600 STB/day at a stabilized bottom-hole flowing pressure of 1800 psi. Analysis of the pressure buildup test data indicates that the pay zone is characterized by a permeability of 120 md and a uniform thickness of 25 ft. The well drains an area of approximately 40 acres. The following additional data is available: r.= 0.25 ft B. = 1.25 bbl/STB A = 40 acres...
1. Consider the following 2D reservoir (different pressure boundaries), where unsteady-state single-phase oil flow is taking place. Use a time step of 10 days and generate the system of equations (implicit, backward-difference scheme), but DO NOT attempt to solve the equations. (20 pnts) Hint: Find the matrix [A] in the equation: [AJXj-d] 200 ft Injection Well; q-300 STB/D 150 t 6000 Psi 6000 Psi 6000 Psi 6000 Psi 5800 Psi 5800 Psi 5600 Psi 5600 Psi ap ay K-Ky- 75...
1. Consider the following 2D reservoir (different pressure boundaries), where unsteady-state single-phase oil flow is taking place. Use a time step of 10 days and generate the system of equations (implicit, backward-difference scheme), but DO NOT attempt to solve the equations. (20 pnts) Hint: Find the matrix [A] in the equation: [AJXj-d] 200 ft Injection Well; q-300 STB/D 150 t 6000 Psi 6000 Psi 6000 Psi 6000 Psi 5800 Psi 5800 Psi 5600 Psi 5600 Psi ap ay K-Ky- 75...