Hi Im a matlab beginner. Would you plz solve my
problem? Thanks!
Matlab)
How to make a code about interpolation?(without using
interp1,imresize..etc the internal function)
I=[1 10 25 432 28 294 70 80]
How to make the I2 whose length is 11 with linear
interpolation?(Without matlab function such as imresize!!)
Explanation : I have sorted the data points. I am finding out
the points which are more required. I am using the line equation y
= mx + c to find new point between two points.
I have taken the given points as value on y-axis and for x-axis I
have considered their position values (1 to number of
elements).
so to find out any new point I have used y = y1 + slope*(x -
x1)
where y1 is the first point and x1 is its position, slope is
(y2-y1)/(x2 - x1)
x2, x1 are the position of points y2, y1.
Below is the function which I have implemented for linear
interpolation:
I have considered that len(required length) will be more than or
equal to the size of given data points.
function res = linearinterpolation(input,len)
% input is the provided set of points
% len is the required length
inputsize = numel(input);
res = [];
if inputsize == len
res = input;
return;
end
sorteddata = sort(input);
diff = len - inputsize;
%diff has the number of new points required to make.
newpoints = [];
%newpoints vector will be having the new points.
for i = 1 : diff
y1 = sorteddata(i);
y2 = sorteddata(i+1);
x1 = i;
x2 = i+1;
slope = (y2 - y1)/(x2 - x1);
xnew = (i + i+1)/2;
val = y1 + slope * (xnew - x1);
%using the line equation y = mx + c, more explanation
is above
newpoints = [ newpoints , val];
end
res = [input , newpoints];
end
Hi Im a matlab beginner. Would you plz solve my problem? Thanks! Matlab) How to make...
Hi Im a matlab beginner. Would you plz solve my problem? Thanks! Matlab) How to make a code about interpolation?(without using interp1,imresize..etc the internal function) I=[1 10 25 432 28 294 70 80] How to make the I2 whose length is 11 with linear interpolation?(Without matlab function such as imresize!!)
by using matlab, how can i solve this problem? 8. The U.S. Standard Atmosphere specifies atmospheric properties as a function of altitude above sea level. The following table shows selected values of temperature, pressure, and density. Altitude (km) -0.5 Temperature (°C) 18.4 Pressure (atm) 1.0607 0.73702 Density (kg/m) 1.2850 0.95697 2.5 -1.1 6 -23.8 0.46589 0.66015 11 -56.2 0.22394 0.36481 20 -56.3 0.054557 0.088911 28 -48.5 50 -2.3 60 -17.2 0.015946 7.8721 X 104 2.2165 X 104 1.0227 X 10-5...
hi can you sovle this problem and do the matlab code please. thanks Problem #1 From ECE 102 Engineering Computation textbook-, problem #1, page 126: Note: C is coulombs of charge, A is amperes of current The flow of charge in a conductor varies with time according to the function g(t)=(1-3,-)C a) Ifk -0.1s, find the current atl e Express your result rounded to 3 decimal places dt b) What is the current for very large values of time r?...
Hi! Would you be able to solve #6 problem using only a financial calculator ? Thanks in advance for your time. pay SPUL VUV Wuvos this price, the bonds yield 5.9 percent. What must the coupon rate be on the bonds? 6. Bond Prices [LO2] Sqeekers Co. issued 15-year bonds a year ago at a coupon rate of 4.1 percent. The bonds make semiannual payments and have a par value of $1,000. If the YTM on these bonds is 4.5...
Hi im having trouble with this homework question. Can someone show me how to do this in C++ with all the steps? Weather Analysis WeatherAnalyzer - New Day Data 2- Good Days 3- Summary 0- Exit Step 0: You can get the sample file from this link: Each row in the text file represent weather measurement of a day. For each day, the file contains the temperature (first column), humidity (second column) and the wind (third column) values emp 70...
can you sovle this problem, also I need the code for part d. thanks Problem #5 Ri Vy= Probe I R- 1502 o VOLTMETER INPUT CIRCUIT Probe 2 Express resistance in ohms (2) and voltage in volts (V) Requirements-Part 1 (voltmeter not attached yet) a) Suppose you want to produce a voltage of 1 V across resistor R2 (i.e. Vor 1 V) Use the voltage divider equation to find the value of Ri that is needed to do this. b)...
I have been trying this problem for over 8 hours. How do I make the Matlab code for the given problem. It has to move. - Use the . You may use cif to clear the figure for the next instant of time The goal is the same as before except this time you will plot a moving 3 bar lin mechanism shown below kage. Use the L2 (k2,ya L3 The equations that govern the motion of this linkage are:...
hi can You please solve [t-BuCl] remaining for my table the concentration of it remaining I only used time trial attempt 1 heres my data with the table thats not filled in on the picture: for % t-BuCl remaining for trials 2-4: I got 85 % trial 2, 90 % trial 3, and 95% trial 4 for trials 1-4 for time 1st attempt I got 87 seconds trial 1 72 seconds trial 2 35 seconds trial 3 7 seconds trial...
Hello, my name is Shady Slim. I understand you are going to help me figure out my gross income for the year... whatever that means. It's been a busy year and I'm a busy man, so let me give you the lowdown on my life and you can do your thing I was unemployed at the beginning of the year and got $2,000 in unemployment compensation. I later got a job as a manager for Roca Cola. I earned $57,500...
How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...