The force/pressure (in tons) required to assemble (press fit)
cylindrical part depends upon the following:
1. Clearance / allowance between mating parts
2. Surface area of mating part
3. Pressure factor
![Solutiom The force required to ascamble ( press fit) cylindvical parts depends upon the allowance between the lndrica parts f](//img.homeworklib.com/questions/c3cadea0-5762-11eb-895a-cf70dd29fcb3.png?x-oss-process=image/resize,w_560)
![Givem data: Inside diameter ‘f hub/bore diameterニ1,5·nch outer diameter of hub leu^th of Hhe hub Needs to be determined - As](//img.homeworklib.com/questions/c44c76a0-5762-11eb-9706-ff4b1736a507.png?x-oss-process=image/resize,w_560)
![Shaft Pin DiameterPressure Shaft/Pin DiameterPressure (Inches) 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25 3.50 3.75 4.](//img.homeworklib.com/questions/c4c09460-5762-11eb-8cb3-9fbc0dd9e1a9.png?x-oss-process=image/resize,w_560)
![From the toble for 1.75 İnch (Short diawetoY)ラ F-275 and for 2.oo ch He. ce b7 Using interpolation : at d-. 1.875 F=257.5 Hen](//img.homeworklib.com/questions/c51425b0-5762-11eb-bbea-0fda7e3020ac.png?x-oss-process=image/resize,w_560)
Solutiom The force required to ascamble ( press fit) cylindvical parts depends upon the allowance between the lndrica parts for the fit, area of the positioned and fited surfaces, the pressure i-ncreasimą in proportion to the listance that the shaft feature is forced 1n The approximate ultimate pres sure m tons can be determined by the follouing formula s or clearance eqn. Cリ A. F) where ptmate pressure required (im tons AArea of surface in contact between the shaft and hole feature a- Total allowance on actual material İnterfen between tha shaft and hola feature (in inches 0%( pin diameter-bore diameter F Pre ssure fachor Assumption:-D『a meter 아 the hub (feature which force is applied to) is twice of the diamete of pin which is pressed into the bore, here pin can be considered as steel shaft .
Givem data: Inside diameter ‘f hub/bore diameterニ1,5·nch outer diameter of hub leu^th of Hhe hub Needs to be determined - As the assumption appnxỉ mate dian eter of- steel shaft ok pin diameter 3.7S 2. Diameter of hub (outer) 2_ d 1.975 inch Nex calculation ' → Total allowance (a) shaft diameter-bore diameter a=i.875-1.5 0.375 inch (Approx ) Tota l surface are a of Contact (A)ラ A 2T (bore diameteree shaf x lengh fhub 27て. ( 1.5 t l·875 2 오 31. 81 ỉnch~ (Approx → Pressure factor (F) : Thas is taken fvom the avai able data tablk wat the. Shaft diameter/ pin diameter
Shaft Pin DiameterPressure Shaft/Pin DiameterPressure (Inches) 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 Factor (F) 500 395 325 275 240 212 189 170 155 145 131 122 115 108 100 96 91 (Inches) 5.25 5.50 5.75 6.00 6.25 6.50 6.75 7.00 7.25 7.50 7.75 8.00 8.50 9.00 9.50 10.00 10.50 Factor (F) 86 82 78 75 72 69 64 61 59 57 52 48.8 46.0 43.5 41.3
From the toble for 1.75 İnch (Short diawetoY)ラ F-275 and for 2.oo ch He. ce b7 Using interpolation : at d-. 1.875 F=257.5 Hence use force factor F= 257.5 Fin! putting all the req us red data in e9n4) bA.a.F = 31.81 x 0.37 5 x 957.5 2. = i5 35.83 (Tons) p 1536 (tons) Approx Answer