A stamping press produces sheet-metal stampings in batches. The press is operated by a worker whose...

A stamping press produces sheet-metal stampings in batches. The press is operated by a worker whose labor rate = $15.00/hr and applicable labor overhead rate = 42%. Cost rate of the press = $22.50/hr and applicable equipment overhead rate = 20%. In one job of interest., the batch size = 400 stampings. The time to set up the die/tooling in the press takes 75 min. The die/tooling used in the operation cost $40,000 and is expected to last for 200,000 stampings. Each cycle in the operation requires the starting blanks of sheet metal to be manually loaded into the press, which takes 42 sec. The actual press stroke takes only 8 sec. Unloading the stamping from the press takes 13 sec. Cost of the starting blanks = $0.23/pc. The press operates 250 days per year, 8 hours per day. Assume availability = 100% and scrap rate = 0. Determine cycle time in minutes and cost per stamping produced in dollars.

Please show all work. I need to understand what is what.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

@ СУСе 6-те Те: ц 2 te+ 13: 63sec 10s mivn 2ncluding setup me TP 8o/yoo t.osabcB σ.379 o 23+Co 3o)C125+0.20 亨),466/PC. 二

Add a comment
Know the answer?
Add Answer to:
A stamping press produces sheet-metal stampings in batches. The press is operated by a worker whose...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A stamping plant supplies sheet metal parts to a final assembly plant in the automotive industry....

    A stamping plant supplies sheet metal parts to a final assembly plant in the automotive industry. Annual demand for a typical part is 150,000 pc. Average cost per piece is $20; holding cost is 25%; changeover (setup) time for the presses is 5 hr; and cost of downtime for changing over a press is $200/hr. Compute the economic batch size and the total annual inventory cost for the data.

  • Gary’s Gears is a production facility that produces metal gears. The first step is stamping, which...

    Gary’s Gears is a production facility that produces metal gears. The first step is stamping, which happens at a press. There are two identical presses that operate simultaneously (gears can be stamped on either press). A press stamps one part at a time. It takes 1 minute to stamp a part, including loading and unloading. Before beginning a new batch of parts, there is a 20-minute setup involving die change. The batch size is 100 parts. In other words, after...

  • SmartArt Raviaw Charts ants Tablas Styles Paragraph AaBbCcDdEe A Normal Text Box 21 Parrish Metal Bearings produces...

    SmartArt Raviaw Charts ants Tablas Styles Paragraph AaBbCcDdEe A Normal Text Box 21 Parrish Metal Bearings produces two sizes of metal bearings (sold by the crate) standard and heavy. The standard bearings require $200 of direct materials per unit (per crate) and the heavy bearings require $245 of direct materials per unit. The operation is mechanized and there is no direct labor. Parrish uses a single plantwide allocation rate for manufacturing overhead, based on machine hours. The direct material cost...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT