Question

Problem 15-4 Answer these questions for the following simple set of project tasks. Task times are shown in hours. a. What is the length of the critical path? b. What are the earliest start and latest start for E? c, what is the latest start for B? d. If all other tasks are completed in their expected durations, will the project length be affected if task B actually takes two hours instead of the expected one? Yes No

Please explain step by step because I do not understand this problem. Thank You!

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
Please explain step by step because I do not understand this problem. Thank You! Problem 15-4...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • HW12: Project Mgmt。 Saved Problem 15-4 Answer these questions for the following simple set of project tasks. Task times are shown in hours. Skipped eBook Print References a. What is the length of th...

    HW12: Project Mgmt。 Saved Problem 15-4 Answer these questions for the following simple set of project tasks. Task times are shown in hours. Skipped eBook Print References a. What is the length of the critical path? 1hou Length of thecriticalpath「 b. What are the earliest start and latest start for E? points Earliest start th/nd hour Latest stat thind hour Sklpped eBook Print References c. What is the latest start for B? test stat th/nd hour d. If all other...

  • Answer these questions for the following simple set of project tasks. Task times are shown in...

    Answer these questions for the following simple set of project tasks. Task times are shown in hours w a. What is the expected time that all five tasks will be completed? Expected time 20 hours b. What is the earliest start for task C? Earliest startſ 4th/nd hour c. What is the latest start for task A? Latest start 1 nd/st hour

  • Provide step by step please thank you, no exce Assume you have a project with ten...

    Provide step by step please thank you, no exce Assume you have a project with ten activities labeled A-J, as shown. Derive the earliest completion time (or early finish-EF), latest completion time (or late finish-LF), and slack for each of the following tasks (begin at time 0) the critical path on your network diagram. . Which tasks are on the critical path? Highligh Preceding Expected Critical Path? Activity Event Duration EF LF Slack A, D C,E D, E F, G...

  • for each problem I have this setup so far. I need help on each part and im not too sure if I am on the right track for each question on the picture. this chapter is on project management for statisti...

    for each problem I have this setup so far. I need help on each part and im not too sure if I am on the right track for each question on the picture. this chapter is on project management for statistics 1. A project is shown by the following network. The durations of activities (in weeks) are indicated on the arrows. a. Identify all of the paths, compute the length of each, identify the critical path and the b. Determine...

  • use excel to solve the problem You and several friends are about to prepare a lasagna dinner. The tasks to be performed,...

    use excel to solve the problem You and several friends are about to prepare a lasagna dinner. The tasks to be performed, their immediate predecessors, and their estimated durations are as follows: Tasks That Time Task Description (minutes) Must Precede 30 Buy the mozzarella cheese* Slice the mozzarella Beat 2 eggs Mix eggs and ricotta cheese Cut up onions and mushrooms Cook the tomato sauce 25 15 10 Boil large quantity of water Boil the lasagna noodles Drain the lasagna...

  • Consider a project having the following six activities:                                  

    Consider a project having the following six activities:                                                      Immediate                                                  Max        Crash cost             Activity                           Predecessors           Time (weeks)             Crash*    per week                   A                                none                                    6                          6                N/A                   B                                none                                    5                          2               $500                   C                                A                                       3                          2             $1000                   D                                A, B                                    4                          2             $2000                   E                                 C, D                                    5                          2             $1250                   F                                D                                       6                          2             $1000                                                                                                 *Shortest possible time for the task 1. Draw the project network and list...

  • please answer from a until i with the solving steps CHAPTER 13 / Developing and implementing...

    please answer from a until i with the solving steps CHAPTER 13 / Developing and implementing Effective Accounting Information Systems 431 14 FIGURE 13-11 PERT network diagram for a systems implementation project. 13-19. Do you understand PERT charts? Refer back to Figure 13-11 and answer the following questions: a. Which activity or activities must be completed before activity C can begin? b. Which activity or activities must be completed before activity G can begin? c. Which activity or activities must...

  • Please help me answer all the questions. Please show work so I can understand the process....

    Please help me answer all the questions. Please show work so I can understand the process. Thanks! (: Problem #1 (8 points) 41 Given a table of activities associated with a project, their durations and preceding activities: activityDuration Precedes ol ne : A (start) 1 wks B,C D.E F.G 1 wk 3 wks 2 wks 1 wk 1 wk 2 wks 2 wks 2 wks (end) 2 points Draw an Activity on Nodes (AoN) diagram of the project, including activity...

  • 2. You are in charge of planning and coordinating next fall's sales management training program ur company. You have never done this before, but you decided to use the lessons from for yo yo...

    2. You are in charge of planning and coordinating next fall's sales management training program ur company. You have never done this before, but you decided to use the lessons from for yo your BUS 190 class to develop a table of tasks to be done, their immediate predecessors, and the most pessimistic, optimistic, and frequent times for each task. The table you developed is below: Task completion time estimate (weeks) Most Immediate Variance Task Predecessor Optimistic probable Pessimistic Mean...

  • Boise Slale University - Logging S Connect C Gel Homework Help With Chegy X + 2...

    Boise Slale University - Logging S Connect C Gel Homework Help With Chegy X + 2 X 2 c ezto.mheducation.com/ext/map/index.html?_con=con&external_browser=0&launchUrl=https%253A%252F%252Fblackboard.boisestate.edu%252Fwebap... u s Apps M Gmail O YouTube Maps C 30 Healthy Pasta Re.... Q CH.11 (test 3) Flash... iMindTap - Cengage... S Micron Tech Project... Q Econ ch 19-22 Flas... 14 Non-invasive Meth.... Answer these questions for the following simple set of project tasks. Task times are shown in hours. A 6 B 4 wm a. What is the expected...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT