Starbright manufactures children car seats, strollers, and baby swings. Starbright’s manufacturing costs are budgeted as follows:

Factory utilities $105,000
Factory foremen salaries $75,000
Machinery setup costs $30,000
Total manufacturing overhead $210,000

The company uses activity-based costing to allocate its manufacturing overhead costs to products based on the following schedule:

Overhead Cost Allocation Base Estimated Activity Level
Factory Utilities Direct labor hours 14,258
Factory foremen salaries Machine hours 21,000
Setup costs Number of production runs 83

During the current month, the following levels of activities were incurred:

Car
Seats
Strollers Baby Swings Total
Direct Labor Costs $ 55,425 $ 84,423 $ 31,258 $ 171,106
Direct Labor Hours 4,619 7,035 2,604 14,258
Machine Hours 7,500 10,250 3,250 21,000
Production Runs 25 40 18 83
Units Produced 1,500 2,500 750 4,750

What are the total manufacturing overhead costs allocated to the Baby Swings for the current month? (Do not round intermediate calculations. Round your answer to the nearest dollar.)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Calculation of total manufacturing overhead costs allocated to the Baby Swings

Particular Amount ($)
Factory Utilities [($105,000 / 14,258 D.L hrs) * 2,604 D.L hrs] 19,176.60
Factory foremen salaries[($75,000 / 21,000 M. hrs) * 3,250 M.hrs] 11,607.14
Machinery setup costs [($30,000 / 83 P.runs) * 18 P.runs 6,506.02
Total manufacturing overhead costs allocated to the Baby Swings $37,289.76 or $37,290
Add a comment
Know the answer?
Add Answer to:
Starbright manufactures children car seats, strollers, and baby swings. Starbright’s manufacturing costs are budgeted as follows:...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Required information (The following information applies to the questions displayed below.) Starbright manufactures children car seats,...

    Required information (The following information applies to the questions displayed below.) Starbright manufactures children car seats, strollers, and baby swings. Starbright's manufacturing costs are budgeted as follows: Factory utilities $105,000 Factory foremen salaries $75,000 Machinery setup costs $30,000 Total manufacturing overhead $210,000 The company uses activity-based costing to allocate its manufacturing overhead costs to products based on the following schedule: Overhead Cost Factory Utilities Factory foremen salaries Setup costo Allocation Base Direct labor hours Machine hours Number of production runs...

  • Owlet distractors inc. uses activity-based costing to determine product costs. Activity rates computed at the beginning...

    Owlet distractors inc. uses activity-based costing to determine product costs. Activity rates computed at the beginning of the year are used to apply manufacturing overhead costs to products. The following data concerning its activity-based costing system has been provided. Estimated overhead and activity rates, at the beginning of the year were: Estimated Expected Activity cost pools Overhead cost Activity Machine related (Machine hours) $431,200 16,000 MHs Batch setup (setups) $661,500 21,000 setups General factory (direct labor-hours) $612,150 26,500 DLHs The...

  • Cornwell Products has adopted an ABC costing system to allocate its overhead costs. The following manufacturing...

    Cornwell Products has adopted an ABC costing system to allocate its overhead costs. The following manufacturing activities and cost drivers have been identified: Activity Machine setup Machining Polishing Quality control Facility-level costs Total overhead costs Estimated OH Costs $180,000 $1,050,000 $100,000 $320,000 $150,000 $1,800,000 Esimated amount of allocation base 2,000 setups 12,000 machine hours 5,000 polishing cloths 4,000 test runs 50,000 DL hours The job cost record for Job #804 revealed the following Direct material costs: $1,250 Direct labor 12...

  • Santana Corporation manufactures snowmobiles in its Blue Mountain, Wisconsin, plant. The following costs are budgeted for...

    Santana Corporation manufactures snowmobiles in its Blue Mountain, Wisconsin, plant. The following costs are budgeted for the first quarter's operations. Machine setup, indirect materials Inspections Tests Insurance, plant Engineering design Depreciation, machinery Machine setup, indirect labor Property taxes Oil, heating Electricity, plant lighting Engineering prototypes Depreciation, plant Electricity, machinery Machine maintenance wages $4,000 16,000 4,000 110,000 140,000 520,000 20,000 29,000 19,000 21,000 60,000 210,000 36,000 19,000 Classify the above costs of Santana Corporation into activity cost pools using the following:...

  • Activity-Based Costing: Factory Overhead Costs The total factory overhead for Bardot Marine Company is budgeted for...

    Activity-Based Costing: Factory Overhead Costs The total factory overhead for Bardot Marine Company is budgeted for the year at $1,250,350, divided into four activities: fabrication, $615,000; assembly, $252,000, setup. $209,100; and inspection, $174,250. Bardot Marine manufactures two types of boats: speedboats and bass boats. The activity base usage quantities for each product by each activity are as follows: Fabrication Assembly Setup Inspection Speedboat 10,250 dlh 31,500 dih 74 setups 128 inspections Bass boat 30,750 10,500 541 897 41,000 dih 4...

  • Questions 11 through 15 are based on the following information. Bachr Company manufacturing company with a...

    Questions 11 through 15 are based on the following information. Bachr Company manufacturing company with a fiscal year that runs from July 1 to June 30. The company a job costing system for its production costs. Anredetermined overhead rate based upon one labor hours is used to apply overhead to individual jobs. A flexible budget of overhead co was prepared for the fiscal year as shown below. Flexible Budget Direct labor hours (DLH) 100,000 120.000 140.000 Variable overhead costs $325,000...

  • Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following...

    Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following activities and costs: Setup (1,000 setup hours) $288,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 180,000 Supervision (2,000 direct labor hours) 56,000 Machine maintenance (12,000 machine hours) 168,000 Total activity costs $752,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours) $1,000 Setup hours...

  • Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following...

    Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following activities and costs: Setup (1,000 setup hours) $ 146,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 90,000 Supervision (2,000 direct labor hours) 56,000 Machine maintenance (12,000 machine hours) 96,000 Total activity costs $ 448,000 The following additional data were provided for Job 845: Direct material costs $ 8,000 Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours)...

  • Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following...

    Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following activities and costs: Setup (1,000 setup hours) $ 146,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 90,000 Supervision (2,000 direct labor hours) 56,000 Machine maintenance (12,000 machine hours) 96,000 Total activity costs $ 448,000 The following additional data were provided for Job 845: Direct material costs $ 8,000 Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours)...

  • Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following...

    Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT