Based on the information below, please write a conclusion
paragraph and also a 1 to 2...
Overview: In responding to a Request for Proposal (RFP), XYZ Contractor is preparing a lump sum price proposal for digging an underground hole with specifications below. • 10m x 10m x 5m - Concept Design • No geotechnical data, assume 80% soil, 20% rock • Productivity rate in soil: 20m3/d 10m • Productivity rate in rock: 10m3/d 10m Excavator: $2000/d • Labor: $500/d 5m • Overhead including profit: $200/d • Additional assumptions can be made, if needed. Objectives: As part of their submission, XYZ Contractor should assess risks, uncertainties and required contingencies. You are working with XYZ Contractor and should support the team to: • explain and develop the Risk Matrix (4 X 4) with three levels of risk scores, i.e. Low, Medium and High • explain and develop the Consequence Table for 'cost', 'time' and WHS impacts • explain and develop the Likelihood Table • explain and develop the escalation table • explain how these tools should be used effectively to identify, analyse and evaluate risks • use the developed tools to assess top 10 risks, and • assess required time and cost contingency