This problem will be solved by finding changeover level of output and on that basis, type of software will be selected.

Let, changeover volume of output (No. of drawings) = X

Then at changeover volume of output,

Total cost of HP software = total cost of SP software

3000 + 200*X = 2000 + 240*X

X = (3000-2000)/(240-200)

X = 25 unit of drawings

Changeover volume of 25 drawings means, for any requirement of more than 25 drawings, HP software should be selected.

It can be proven by following calculations:

At 80 drawings,

Total cost using HP software = 3000 + 200*80 = $19000

Total cost using SP software = 2000 + 240*80 = $21200

So, use of HP software is cheaper and best option for 80 drawings per month.

Hence , for 80 drawings per month, it is renting of HP software that is the best option

Add a comment
Know the answer?
Add Answer to:
This Testopis pos This Question: 1 pt 1 of 6 (0 complete) em Keith Whittingham, as...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • High-performance or standard-performance? X Problem 7.8 :s Question Help Matthew Bailey, as manager of Designs by...

    High-performance or standard-performance? X Problem 7.8 :s Question Help Matthew Bailey, as manager of Designs by Bailey, is upgrading his CAD software. The high-performance (HP) software rents for $3,000 per month per workstation. The standard-performance (SP) software rents for $2,000 per month per workstation. The productivity figures that he has available suggest that the HP software is faster for his kind of design. Therefore, with the HP software he will need 5 engineers and with the SP software he will...

  • Problem 7.1 Question Help Borges Machine Shop, Inc., has a 1-year contract for the production of...

    Problem 7.1 Question Help Borges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: Annual contracted units Annual fixed cost Per unit variable cost General Purpose Equipment (GPE)...

  • . Required Question: 1. Should Matt try to suggest a better method for reducing purchasing costs?...

    . Required Question: 1. Should Matt try to suggest a better method for reducing purchasing costs? (200 words) 3. How can Matt find out more information about the suppliers in a short period of time? (200 words) 3. what are his internal or external resources that he should consider? Custom Equipment It was July 2, and Mat Roberts had just been given his robots/weldguns, affiliate-produced parts/fabricated com- first assignment, te Wire Management Program" ponents, and steel/other metals. Matt was hired...

  • Hi, Kindly assist with my project management assignment below using the attached case study Question 1 Update the project charter for the remainder of the project in response to Adams’ memo (lines 241...

    Hi, Kindly assist with my project management assignment below using the attached case study Question 1 Update the project charter for the remainder of the project in response to Adams’ memo (lines 241 through 246). Question 2 Prepare a plan for the remainder of the project in response to Adams’ memo (lines 241 through 246). Your answers to the above will be assessed in terms of the level of communication displayed, the insights and inferences drawn, and your ability to...

  • STEP 1: In your own words define problem employees and the categories they may fall into....

    STEP 1: In your own words define problem employees and the categories they may fall into. For the second or last paragraph provide your opinion on which employee type is the most difficult. DEFINITION : I think that "problem employees" are employees that either directly or indirectly hinder the organization's mission or vision, and break down into roughly four categories. In general, problem employees can be classified into two broad categories - employees creating problems for the organization and employees...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT