Solution::
From|To | 1 | 2 | 3 |
A | 88 | 82 | 0 |
B | 130 | 0 | 0 |
C | 27 | 0 | 163 |
Total cost = 4652
WK Qu. 3-13 A firm is attempting to minimize... A firm is attempting to minimize its...
WK Qu. 3-13 A firm is attempting to minimize... A firm is attempting to minimize its shipping costs. The firm has 3 factories and must supply the needs of its 3 customers without shortages. Since the firm has no storage facilities, each factory must make daily shipments to its customers. The table below shows the capacity of each factory, the amount required by each customer, and the cost of shipping from each factory to each customer. Customer 1 Shipping Costs...
A firm is attempting to minimize its shipping costs. The firm has 3 factories and must supply the needs of its 3 customers without shortages. Since the firm has no storage facilities, each factory must make daily shipments to its customers. The table below shows the capacity of each factory, the amount required by each customer, and the cost of shipping from each factory to each customer. Shipping Costs ($/unit)Factory/CapacityCustomer 1Customer 2Customer 3A/130 units978B/120 units10913C/140 units1065Requirement—195unitsRequirement—65unitsRequirement—130units
A firm is attempting to minimize its shipping costs. The firm has 3 factories and must supply the needs of its 3 customers without shortages. Since the firm has no storage facilities, each factory must make daily shipments to its customers. The table below shows the capacity of each factory, the amount required by each customer, and the cost of shipping from each factory to each customer Shipping Costs ($/unit) Factory/Capacity A/190 units Customer 1 Customer 2 Customer 3 10...
A manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20...
A manufacturing firm has three plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Factory Customer 1 Customer 2 Customer 3 Customer 4 Factory Capacity A $15 $10 $20 $17 100 B $20 $12 $19 $20 75 C $22 $20 $25 $14 100 Customer Requirement 25 50 125 75 How...
9-7 The management of the Executive Furniture Corporation decided to expand the production capacity at its Des Moines factory and to cut back the production capacities at its other two factories. It also recognizes a shifting market for its desks and revises the requirements at its three warehouses. The table on this page provides the requirement at each of the warehouses, the capacity at each of the factories, and the shipping cost per unit to ship from each factory to...
9-7 The management of the Executive Furniture Corpo- ration decided to expand the production capacity at its Des Moines factory and to cut back the produc- tion capacities at its other two factories. It also rec- ognizes a shifting market for its desks and revises the requirements at its three warehouses. The table on this page provides the requirement at each of the warehouses, the capacity at each of the factories, and the shipping cost per unit to ship from...
The Medequip Company produces precision medical diagnostic equipment at two factories. Three medical centers have placed orders for this month’s production output. The table shows what the cost would be for shipping each unit from each factory to each of these customers. Also shown are the numbers of units that will be produced at each factory and the number of units ordered by each customer.A decision now needs to be made about the shipping plan for how many units to...
Wk Qu. 4-15 An analyst has started... An analyst has started preparing a spreadsheet as shown below. Column A contains the headings for various parameters and column B analysts name to be used in Excel.AB1Price per UnitPrice per Unit2Cost per UnitCost_Per_Unit3Profit per UnitProfit per Unit45Fixed CostsFixed_Costs6Variable CostsVariable_CostsLabel each of the following range names as "Correct" if is a valid range name in Excel or "Incorrect" if the range name is not valid for use in Excel. Proposed Range NamePrice per UnitCost_Per_UnitProfit per...
Location Section Project A small logistic company named LogTransit currently has 3 manufacturing facilities (suppliers) called Supplier #1, #2 and #3 to supply for goods of its 3 retail stores (customers) called Customer A, B, and C. Due to customer demands at stores are increasing, the company is considering to construct a new manufacturing facility. The new factory will have a supply capacity of 200 units per week. After screening many potential sites, Toledo and Cincinnati have been determined to...