Question

nment #2 (Part A & B) Assigned: 01/23/2019 Due Date: 02/01/2019 Total Points 110 Part B A completely mixed flow reactor is to be designed to treat an influent stream with a COD concentration of 250 mg/L and a flow rate of 150 gallons per minute (GPM). Assume COD removal reaction has a degradation rate constant of 0.38 h1. Determine the hydraulic detention time (in hours) for the reactor and the volume of the reactor in ftIf the effluent COD is 20 mg/L (COD-chemical oxygen demand, COD represents the total quantity of oxygen required to oxidize organic matters to carbon dioxide and water; it is measure of contamination). (10)
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Influent concentration, Co 250 mg/L Effluent concentration, Ce 20 mg/L Rate constant, K 0.38 h1 Flow rate, Q 150 gpm 9000 gallons/hour 1203 ft3/hr For a completely mixed flow reactor, 1. For 1st order reaction, 1203 I250 0.38 20 V 36406.5 ft3 HRT- 36406.5 HRT- 1203 HRT 30.26 hours 2. For 2d order reaction, KCe LCe 1203 [250 0.38 x 20 L20 V 1820.3 ft3 HRT- HRT 1820.3 1203 HRT 1.51 hours

Add a comment
Know the answer?
Add Answer to:
nment #2 (Part A & B) Assigned: 01/23/2019 Due Date: 02/01/2019 Total Points 110 Part B...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • reply ma as soon as possible 120 points total Due: October 23, 2019 Budget your time...

    reply ma as soon as possible 120 points total Due: October 23, 2019 Budget your time carefully TRUE OR FALSE (45 points - 3 points cach): Mark whether the statements as written are "true" or "false". If the statement is false, make minor changes to the statement so that the statement is true. The primary adverse health effect resulting from the disposal of mercury wastes into Minamata Bay was dysentery The flow regime in horizontal velocity grit chambers approaches continuous...

  • 1. In 1970, the total phosphorus (TP) load to Lake Erie was 18.150 tonnes/year (where tonnes...

    1. In 1970, the total phosphorus (TP) load to Lake Erie was 18.150 tonnes/year (where tonnes or metric ton = 1,000 kg). The surface area, volume, and outflow from Lake Erie are given as 25.2 x 10 m² 468 x 10 m, and 182 x 10 m yr, respectively. Based on previous evaluations, the total phosphorus is removed from the lake with an apparent settling rate of 16 m/yr. a. Draw a diagram and write the mass balance equation for...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT