Question

In order to model temperature distribution of thin plate, we use quadrilateral element. It's natural coordinate system of plate. Determine temperature of point A (0.5 , -0.5) and show detail process.

2 120 oC 90 oC -1 85 oC 82oC -3 3 -2 -1 012 3 Windows

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
In order to model temperature distribution of thin plate, we use quadrilateral element. It's natural coordinate...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. Consider the pendulum model that we discussed in class. It's also on page 71 of the lecture notes 4. Again, for simplicity, we assume m-1-1-1 Suppose in addition we consider a damping force of...

    1. Consider the pendulum model that we discussed in class. It's also on page 71 of the lecture notes 4. Again, for simplicity, we assume m-1-1-1 Suppose in addition we consider a damping force of this model as follows. The magnitude of the damping force is proptional to angular velocity while its direction is opposite to the one of the angular velocity. For simplicity, we may assume the damping force to be -' Then the net external torque become τ...

  • *20 On pp. 188-189 of ODELA we learn about a 1st order linear DE system model...

    *20 On pp. 188-189 of ODELA we learn about a 1st order linear DE system model for quantities of lead stored in 1) the blood, 2) body tissues, and 3) bones. The model is [x] [x] [Iz(t)] [-13/360 272/21875 7/200000 * = A x2 + 0 , where A = 1/90 -1/35 0 [23] [X3] [0] 7/18000 -7/200000 (a) Approximate eigenpairs for the matrix A are provided at the top of p. 190. Use them to write the homogeneous solution—i.e.,...

  • #5 is only I need in which we need to plot it on Matlab and I...

    #5 is only I need in which we need to plot it on Matlab and I don't know how to plot it. Project 1 A Vibration Insulation Problem Passive isolation systems are sometimes used to insulate delicate equipment from unwanted vibrations. For example, in order to insulate electrical monitoring equipment from vibrations present in the floor of an industrial plant, the equipment may be placed on a platform supported by flexible mountings resting on the floor. A simple physical model...

  • I don't understand this. Last year [year 1), we decided to drop our highest-end Red model...

    I don't understand this. Last year [year 1), we decided to drop our highest-end Red model and only produce the Yellow and Green models, because the cost system indicated we were losing money on Red. Now, looking at the preliminary numbers, our profit is actually lower than last year and it looks like Yellow has become a money loser, even though our prices, volumes, and direct costs are the same. Can someone please explain this to me and maybe help...

  • only questions number: #3,6,8,16,19,22 Δι CH 122 - Practice Problems for Chapter 12 Do NOT use...

    only questions number: #3,6,8,16,19,22 Δι CH 122 - Practice Problems for Chapter 12 Do NOT use this problem set solely as test preparation. This problem set does NOT cover everything that we have discussed in class. You will still need to study class materials in order to do well on the learning assessment. 1. Of the following all are valid units for a reaction rate except A. moll B. M/S C. molhr D.g's E.molle 2. Which one of the following...

  • Paraphrase and ssummatize the article into throes paragraphs: introduction, body and conclusion BY DAVE BARISTA, MANAGINU...

    Paraphrase and ssummatize the article into throes paragraphs: introduction, body and conclusion BY DAVE BARISTA, MANAGINU EDITUR While the emergence of building information modeling is no doubt providing huge advantages in cost and time savings on all types of projects, perhaps no other building type stands to benefit more from BIM than healthcare facilities, where cost and schedule are crucial and where quality control can literally be a matter of life and death. "BIM is a perfect fit for healthcare...

  • The following ANOVA model is for a multiple regression model with two independent variables: Degrees of            Sum of                 Mean Source           Freedom            Squares              ...

    The following ANOVA model is for a multiple regression model with two independent variables: Degrees of            Sum of                 Mean Source           Freedom            Squares                Squares       F       Regression            2                    60 Error                   18                 120 Total                   20                 180 Determine the Regression Mean Square (MSR): Determine the Mean Square Error (MSE): Compute the overall Fstat test statistic. Is the Fstat significant at the 0.05 level? A linear regression was run on auto sales relative to consumer income. The Regression Sum of Squares (SSR) was 360 and...

  • Playgrounds and Performance: Results Management at KaBOOM! (A) We do this work because we want to...

    Playgrounds and Performance: Results Management at KaBOOM! (A) We do this work because we want to make a difference in the world; how can we go further faster? - Darell Hammond, CEO and co-founder, KaBOOM! Darell Hammond stepped onto the elementary school playground and took a long, slow look around. It was 8 a.m. on an unusually warm fall day in 2002 and the playground was deserted, but Hammond knew the children would start arriving soon to admire their new...

  • We conducted a comprehensive literature search on drones in conservation up to October 2nd 2018, in...

    We conducted a comprehensive literature search on drones in conservation up to October 2nd 2018, in line with related studies [10,11,35]. All searches were done by the same person in English, mainly using Google Scholar. This was further complemented through reference harvesting, citation tracking, abstracts in conference programs, and author search, using Research Gate and Mendeley (see PRISMA Flowchart in Supplementary Figure S1 Checklist and list of studies reviewed in Table S1). We then removed duplicate and unrelated results. Finally,...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT