At 51 cents per square foot, plus a $60 delivery charge, how much will it cost...
A sales representative needs to design a display booth for trade shows. Because trade show organizers typically charge for floor space at their shows, the booth is to be 300 square feet. The booth is to be 6 feet tall and three-sided, with the back of the booth made of display board and the two sides of the booth made of gathered fabric. The display board for the back of the booth costs $20 per square foot. The fabric costs...
If electrical energy costs 12 cents, or $0.12, per kilowate hour, how much does it cost to (a) burn a 100-W lightbulb for 24 h? (b) Operate an electric oven for 5.0 hifit carries a current of 20.0 A at 220 V?
part 2 only please You bought a piece of land at $1,000,000. You plan to build a 50,000 square foot building at cost of $100 per square foot, all inclusive, in addition to land cost. The completed building is expected to generate a monthly rent of $1.10 per square foot per month for year 1 and the rent will increase at 5% per year operating expenses will be 0.35 per square foot per month for year 1 and increase at...
Help C++ Design a program for determining how much a fence will cost based on the size of a residents back yard. Luckily, every resident has a square backyard with side lengths of at least 6 feet. Unfortunately, there is a local zoning requirement that all fences must be exactly 2 feet inside the perimeter of a backyard. The local fence construction company will charge 10 dollars per foot of fence. Based on the description above design a program that...
Standard Cost per Unit Actual Cost per Unit $ 3.96 $ 4.20 12.60 Direct materials: Standard: 1.80 feet at $2.20 per foot Actual: 1.75 feet at $2.40 per foot Direct labor: Standard: 0.90 hours at $14.00 per hour Actual: 0.95 hours at $13.40 per hour Variable overhead: Standard: 0.90 hours at $5.00 per hour Actual: 0.95 hours at $4.60 per hour Total cost per unit Excess of actual cost over standard cost per unit 12.73 4.50 4.37 $ 21.30 $21.06...
Question options 1. Fixed, mixed, variable 4. the fixed cost per patient day is reduced, the total fixed costs have changed, the variable cost per patient day decreases St. Teresa's Medical Center (STMC) offers a number of specialized medical services, including neuroscience, cardiology, and oncology. STMC's strong reputation for quality medical care allowed it to branch out into other services. It is now ready to expand its orthopedic services and has just added a free-standing orthopedic clinic offering a full...
Cost Behavior, High-Low Method, Pricing Decision St. Teresa's Medical Center (STMC) offers a number of specialized medical services, including neuroscience, cardiology, and oncology. STMC's strong reputation for quality medical care allowed it to branch out into other services. It is now ready to expand its orthopedic services and has just added a free-standing orthopedic clinic offering a full range of outpatient, surgical, and physical therapy services. The cost of the orthopedic facility is depreciated on a straight-line basis. All equipment...
This is cost accounting question. Please help me in part 3 (part 3 has 3 answers) and 4. Show calculations please so I can see where I am wrong. Please do it correctly. This initial per-day charge was quoted to patients entering the orthopedic center during the first two months with assurances that if the actual operating costs of the new center justified it, the charge could be less. In no case would the charges be more. A temporary policy...
Requirement 1. Allocate Lakeview LawnLakeview Lawn USA's costs to the activity-cost pools and determine the activity rate for each pool. Start by allocating Lakeview LawnLakeview Lawn USA's costs to the activity-cost pools. (Enter zero in any cell if no amount should be allocated to the activity-cost pool.) Estimating Lawn Landscape jobs care design Other Total Wages and salaries Depreciation Supplies Other overhead Total Now select the formula used to determine the cost driver rates, then calculate the activity rate for...
Requirement 1. Allocate Lakeview LawnLakeview Lawn USA's costs to the activity-cost pools and determine the activity rate for each pool. Start by allocating Lakeview LawnLakeview Lawn USA's costs to the activity-cost pools. (Enter zero in any cell if no amount should be allocated to the activity-cost pool.) Estimating Lawn Landscape jobs care design Other Total Wages and salaries Depreciation Supplies Other overhead Total Now select the formula used to determine the cost driver rates, then calculate the activity rate for...