A firm has redesigned its production process so that it now takes 10 hours for a unit to be made. Using the old process, it took 15 hours to make a unit. If theprocess makes one unit each hour on average and each unit is worth $1,500 , what is the reduction in work-in-process value?
0 0
Add a comment Improve this question Transcribed image text
Answer #1

WIP = Flow rate * Cycle Time

Initial WIP = (1 per hour) * 10 hours = 10

FInal WIP = (1 per hour) * 15 hours = 15

Initial WIP value = 10 * 1500 = 15000

Final WIP value =15 * 1500 = 22500

Reduction in WIP = 22500 - 15000 = 7500

Add a comment
Answer #2

For old system:

Work in process = 15 hours x $1500 = $22,500

For new system:

Work in process = 10 hours x $1500 = $15000

Work in process reduction = $22,500 - $15000 = $7500

Add a comment
Know the answer?
Add Answer to:
Work-in-process value
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A firm has redesigned its production process so that it now takes 9 hours for a...

    A firm has redesigned its production process so that it now takes 9 hours for a unit to be made. Using the old process, it took 14 hours to make a unit. If the process makes two unit each hour on average and each unit is worth $1,500 What is the reduction in work-in-process value? Reduction in WIP

  • Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...

    Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). C. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection, 1. It takes 48 minutes and five pounds of material...

  • Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...

    Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). c. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection. Choose "Multiple" in the Root cause column, wherever there is...

  • A batch of material must visit two work stations in series to be converted into finished...

    A batch of material must visit two work stations in series to be converted into finished product. Each batch makes 100 units. Setup time at each work station is 30 minutes. Variable processing time is 3 minutes/unit and 5 minutes/unit in station 1 and station 2 respectively. After completing the operation the batch has to wait on average of 1 hour for the material handler to move it to the next machine. Assuming there is no time lost in waiting...

  • Alpha Assemblies produces a wide variety of products in their central Nebraska facility. Many of these products fit with...

    Alpha Assemblies produces a wide variety of products in their central Nebraska facility. Many of these products fit within a line of standard truck and trailer parts. Within this is a set of hitches that can be made in two sizes (1-1/4 and 2) and three strengths (light duty, medium duty, and heavy duty). All of the hitches in this line have "natural" finishes so no additional steps are necessary after they are cast. The machine used to cast these...

  • please show work. Company owns 25 jars and 1 worker can make 20 per hour. so,...

    please show work. Company owns 25 jars and 1 worker can make 20 per hour. so, 1 hour labor = 20 jars. same materials will be used. $9/hr for workers. Option 1: jar production can be done at plant with workers Option 2: rent a machine to make jars. 500 per hour. cost of machine includes everything for $80/hour 1. what is the MPL? 2. what is the MPK? 3. recommended hours of labor and captial? 4. if jars were...

  • wing costs have been HEN AEN has a single production process, for which the following coste...

    wing costs have been HEN AEN has a single production process, for which the following coste estimated for the period ending 31st December Year 7: GH¢ Material receipt and inspection costs 31,200 Power costs 39,000 Material handling costs 27,300 HEN makes three products - X, Y and Z. These products are made by group of employees, using power drills. The employees are paid GH¢8 The following budgeted information has been obtained for the period endir December Year 7: ade by...

  • a) Outline the objectives of management accounting (3 Marks) b) Assume that a certain process has...

    a) Outline the objectives of management accounting (3 Marks) b) Assume that a certain process has an 95% learning curve effect and the first unit took 4000hrs to produce. Required: i) Compute the number of hours required to produce the first 34 units                                                   (3 Marks) ii) Compute the number of hours required to produce 34th unit.                                                (2 Marks) iii) Assume that the wage rate is Kshs.100 per hour, compute the Labor cost of producing the last 16 units...

  • What is capital Money spent to improve one's Any item value Money spent to make more...

    What is capital Money spent to improve one's Any item value Money spent to make more money Money future use Question 9 As capitairesresents value and therefore represents Fick phrase to the blank so the resulting sentence becomes a true statement wealth private property human labor power Question 10 M-C Pick anopression to complete the above formula 56 that it becomes the simple formula M M AM DQuestion 11 A person paid 100 a and produces or services worth $120...

  • A process/department (using process costing) has competed all units from the beginning work-in-process and units started....

    A process/department (using process costing) has competed all units from the beginning work-in-process and units started. Both the weighted average and FIFO method will result in the same amount for: A cost of compete units Os equivalent units of production for materials Ocequivalent units of production for materials (if beginning work-in-process is 100% as to materials) D.cost per equivalent unit for conversion (if beginning work-in-process is 100% as to conversion)

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT