Question

Alpha Assemblies produces a wide variety of products in their central Nebraska facility. Many of these products fit with...

Alpha Assemblies produces a wide variety of products in their central Nebraska facility. Many of these products fit within a line of standard truck and trailer parts. Within this is a set of hitches that can be made in two sizes (1-1/4 and 2) and three strengths (light duty, medium duty, and heavy duty). All of the hitches in this line have "natural" finishes so no additional steps are necessary after they are cast. The machine used to cast these six hitch variations is available for 2000 hours per year. Operators are paid $15.00 per hour including benefits.

Simone is working to establish her reputation at Alpha Assemblies as part of her internship opportunity. She is looking for a way to improve the operations. She has been working on the hitch project and is looking at possible ways to cut costs. At this point she has studied the processes and their associated costs, and completed forecasts for the next year's demand.

Hitch A is the 1-1/4 inch, light duty, natural hitch. Simone has forecast the demand for this hitch at 6,000 units for the next year. It takes one operator 5.7 hours to perform a setup to produce a batch for this hitch and no other setup costs are incurred when setting up the machine. In addition, the holding costs for this item are $4.16 per unit per year. This hitch has a current batch size of 1,500 units per production run.

Hitch B is the 1-1/4 inch, medium duty, natural hitch. This hitch has a forecast annual demand for next year of 3,000 units and has a current batch size of 1,500 units per production run. The unit processing time for this hitch is 0.0420 hours per unit, setup time using a single operator is 6.6 hours per setup and the holding cost per unit per year is $3.34. No additional costs are incurred in the setup process.

Hitch C has a forecast annual demand for next year of 7,000 units and a current batch size of 1,500 units. It takes 0.0400 hours to produce each unit and the setup time for a production run is 8.4 hours. Hitch C has a holding cost of $3.57 per unit per year. The value of each Hitch C as it is stored in inventory is $29.66 per unit. As with Hitches A and B, it takes 1 worker to perform the setup and no other costs are incurred in the setup process.

Hitch D has a forecast annual demand for the next year of 10,000 units. It takes 5.7 hours to complete a setup using a single worker and there are no other costs incurred during the setup process. The holding cost per unit per year is $3.57. The current batch size is 2,000 units. The unit processing time for Hitch D is 0.0380 hours per unit.

How much more time (in hours) will be spent on setups if Hitch D is produced using Simone's recommendation of EOQ than with the current batch size?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

No. of batches needed to complete the demand = 1000/2000 = 5

Time taken to produce one batch = 5.7 + 2000 * 0.0380 hours = 81.7 hours

Total time taken = 5*81.7 = 408.5

Labor Cost = $15*408.5 = $6127.5

Holding cost = $3.57

Fixed Cost = 6127.5 + 3.57 = $6131.07

EOQ = Sqrt. (2FD/C) = Sqrt.([2*6131.07*10000]/15) = 2859

Add a comment
Know the answer?
Add Answer to:
Alpha Assemblies produces a wide variety of products in their central Nebraska facility. Many of these products fit with...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 2. Montegut Manufacturing produces a product for which the annual demand is 20,000 units. Production averages...

    2. Montegut Manufacturing produces a product for which the annual demand is 20,000 units. Production averages 80 units per day, while demand is 30 units per day. Holding costs are $5.00 per unit per year, and setup cost is $250.00. (a) If the firm wishes to produce this product in economic batches, what size batch should be used? (b) What is the maximum inventory level? (c) How many order cycles are there per year? (d) What are the total annual...

  • Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has...

    Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost Daily production Annual demand Desired lot size $30 per hour $14 per unit 1,008 units/8 hour day 43,680 (260 days each x daily...

  • Carol Cagle has a repetitive manufacturing plant producing trailer hitches in​ Arlington, Texas. The plant has...

    Carol Cagle has a repetitive manufacturing plant producing trailer hitches in​ Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one​ component, the safety chain​ clip: Setup labor cost ​$25 per hour Annual holding cost ​$14 per unit per unit Daily production 992 units/8 hour day Annual demand 25300 (275​ days each ×daily demand of...

  • The production floor produces 8500 units/day and the associated direct-operated store sells 50 units/hour with the...

    The production floor produces 8500 units/day and the associated direct-operated store sells 50 units/hour with the selling price at $120/unit. The direct-operated store operates 12 hours/day and 365 days/year, but the production works for 250 working days/year. Given that the production setup cost per production run is $1500 and the holding cost per year is $5/unit. (a) Calculate the optimal batch size for each production run. (b) What is the maximum inventory level with regard to the optimal batch size?...

  • Pasternik Company produces and sells two products, Alpha and Zeta. The following information is available relating...

    Pasternik Company produces and sells two products, Alpha and Zeta. The following information is available relating to its setup activities: Alpha Zeta Units produced 300 28,000 Batch size (units) 20 800 Total direct labor hours 2,000 56,000 Cost per setup $ 3,000 $ 3,000 Use of activity-based costing would allocate the following amounts of setup cost to each unit: (Rounded to the nearest cent.) Alpha Zeta A) $ 150.00 $ 3.75 B) $ 375.00 $ 900.64 C) $ 4.92 $...

  • A manufacturer of rotary pumps is planning production for the next four months. The forecast demand...

    A manufacturer of rotary pumps is planning production for the next four months. The forecast demand for the rotary pumps is shown in the following table Rotary pump Standard Heavy duty SEP 650 900 ост 875 350 NOV 790 1,200 DEC 1,100 1,300 At the beginning of September, the warehouse is expected to be completely empty. There is room for no more than 1,800 rotary pumps to be stored. Holding costs for both types are S5 per unit per month....

  • Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use...

    Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells. Meritor has designed each cell to fabricate a specific family of muffler products. Fabricating a muffler assembly involves cutting and bending pieces of pipe that are welded to a muffler and a catalytic converter. The mufflers and catalytic converters are pulled into the cell based on current demand. The catalytic converters are made in a...

  • A product has a demand of 436 units per month. Ordering cost is $20, and holding...

    A product has a demand of 436 units per month. Ordering cost is $20, and holding cost is $4 per unit per year. The EOQ model is appropriate. The total management cost (holding and setup costs only) for this product will be per year. demand 436 per month order cost $20 per order holding cost $4 per unit per year Excel Access QUESTION 29 A drone company builds its own motors, which are then put into each drone. While the...

  • Problem 16.1 : Question Help Carol Cagle has a repetitive manufacturing plant producing trailer hitches in...

    Problem 16.1 : Question Help Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip Setup labor cost $30 per hour Annual holding cost $14 per unit Daily production 960 units/8 hour day Annual demand 33,000 (275 days each...

  • Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has...

    Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost Daily production Annual demand Desired lot size $20 per hour $12 per unit 976 units/8 hour day 25,300 (275 days each x daily...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT