1. Pareto Chart:
Defects that are in high priority list are: Dirt in Paint, Sag, Peeling that together constitute around 60% of the total cumulative defects. Hence, it is imperative to correct these defects on high priority basis.
The highest priority defect among all, of course is, the dirt in paint defect with the highest count.
2. Cost needed to correct defects:
Dirt in Paint Cost = 82 * $27 = $2,214
Peel defect cost = 29 * $22 = $638
Sag defect cost = 39 * $102 = $3,978
Sag defect being the most expensive among the three should be corrected first.
one question 2 parts. The chart needed is Pareto Chart. The following information was collected to...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...