Question

3. Traffic on an approach of a signalized intersection is traveling at 35 mph with a density of 46 veh/mi/In. The red phase o

0 0
Add a comment Improve this question Transcribed image text
Answer #1

L1 = 46 veh/ min ka=125 vehlmilln - Pot all above above values in values 17 Equation = 0 -1610 veh/ho/lone 125-46 Jen/millan

Add a comment
Know the answer?
Add Answer to:
3. Traffic on an approach of a signalized intersection is traveling at 35 mph with a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 6, Traffic Shockwave theory (15%) Vehicles approaching an signalized intersection are traveling at speed 40 miles...

    6, Traffic Shockwave theory (15%) Vehicles approaching an signalized intersection are traveling at speed 40 miles per hour and the density is about 40 vehicle/miles/lane (vehicle arrival). The red light last about 40 sec. If the saturation flow is 1900 vehhr/lane with a density of 52 veh/miles/hour (queue discharging). and the jam density is 120 veh/mile lane, please determine: a. the queue length at the end of the red light: b. the maximum queue length: c. The time it takes...

  • Homework Assignment #6: Traffic Signalization An approach at a pretimed signalized intersection h...

    Homework Assignment #6: Traffic Signalization An approach at a pretimed signalized intersection has an arrival rate of 500 and a saturation flow rate of 3000. 30 seconds of effective green are given in a 100-second cycle. Analyze the intersection assuming D/D/1 queueing by describing the proportion of the cycle with a queue, the maximum number of vehicles in the queue, the total and average delay, and the maximum delay. Homework Assignment #6: Traffic Signalization An approach at a pretimed signalized...

  • An approach at a pretimed signalized intersection has a saturation flow rate of 2000 veh/h

    An approach at a pretimed signalized intersection has a saturation flow rate of 2000 veh/h and is allocated 15 seconds of effective green in a 60-second signal cycle. If the flow at the approach is 300 vel/h, provide an analysis of the intersection assuming D/D/1 queuing. a. The time to queue clearance after the start of the effective green b. The Proportion of cycle with a queue c. The proportion of vehicles stopped d. The Maximum number of vehicles in the queue e. The total...

  • What is the time it takes to clear the queue? A roadway near a signalized intersection...

    What is the time it takes to clear the queue? A roadway near a signalized intersection can be modeled using Newell's triangular model. The roadway section has a free-flow speed of 50 mph, optimum density of 75 vpm and jam density of 325 vpm. In a typical day, the uncongested demand of the roadway is 3000 vph. The red time and green time is 30 seconds each. Determine:

  • 4.A two-phase signal system is to be designed for an isolated intersection with a peak hour tacto...

    Transportation Can correct the answer 4.A two-phase signal system is to be designed for an isolated intersection with a peak hour tactor 81 0.99. TIL lane volumes are: Phase A-550 veh/hr, Phase B 600 veh/hr, The total lost time L is 14 sec. Determine an appropriate cycle length for the intersection that will satisfy the following conditions: minimum cycle length-45 sec, maximum cycle length = 120 sec, maximum critical ve ratio (Xc)-0.85 and The saturation flow per lane for each...

  • (10 points) 4. Studies have shown that the traffic flow on a single-lane intersection can be desc...

    (10 points) 4. Studies have shown that the traffic flow on a single-lane intersection can be described by 130veh/mile, determine the velocity of the if the density on the approach is 45veh/mile and the space mean spee red interval, what length of the approach upstream from the stop line w the Greenshields model. If the jam density on the approach is stopping shockwave when the approach changes to red is 40mph. At the end of the l vehicles be affe...

  • 5. Traffic on Route 15 south of Selinsgrove was observed at two different times. The first...

    5. Traffic on Route 15 south of Selinsgrove was observed at two different times. The first observation found a flow rate of 1,863 vehicles per hour per lane and a density of 85 vehicles per mile. The second observation found a flow rate of 1,050 vehicles per hour per lane and a density of 25 vehicles per mile. Using this data, compute the following: a. For both observations, determine the vehicle speed [mph] and the time headway [sec] b. If...

  • 4. For the traffic characteristics shown below, determine suitable phase lengths for the intersection using the...

    4. For the traffic characteristics shown below, determine suitable phase lengths for the intersection using the Webster method. For each approach, assume one dedicated left-turn lane, one through lane, and one through-right lane North A South A h East A Left Tunm Through Movement Right Turn 135 415 138 162 559 167 West Approach 135 514 370 131 -PHF = 0.95 Left-turn factor 1.4 -Right-turn factor-1.0 -PCE for buses and trucks =1.6 -Truck percentage-3% for westbound traffic and zero otherwise...

  • The saturation flow rate for an intersection approach is 3600 veh/h. At the beginning of a...

    The saturation flow rate for an intersection approach is 3600 veh/h. At the beginning of a cycle (effective red) no vehicles are queued. The signal is timed so that when the queue (from the continuously arriving vehicles) is 13 vehicles long, the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds, what is the arrival rate, assuming D/D/1 queuing? Draw D/D/1 queuing diagram and label accordingly ??...

  • A traffic signal control is being designed for an intersection on a divided highway with the char...

    A traffic signal control is being designed for an intersection on a divided highway with the characteristics shown in the table below. Determine an appropriate length of the yellow interval for each approach and how you will provide it. Assume the average vehicle length L is 20 ft, and the perception-reaction time ỗ is 1.0 sec. a is 1 1.2 ftSec2, g-32.2 ft/sec2 E-to-W Approaches 18 N-S Approaches Median width, (ft) 16 4 Number of 12 ft lanes on each...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT