Question

operation management

Any increase in efficiency also increases utilization. Although the upper limit on efficiency is 100

percent, what can be done to achieve still higher levels of utilization?


0 0
Add a comment Improve this question Transcribed image text
✔ Recommended Answer
Answer #2

ANSWER :


Capacity utilisation = Actual output / Designed capacity


Efficiency = Actual output / Effective capacity.


Effective capacity is the maximum achievable capacity in the current conditions and is less than the designed capacity since designed capacity is the ideal level and effective capacity is the acievable  one.


From the above it can be seen that efficiency increase is the outcome of increase of output. So, it is obvious that increase of efficiency also results in the increase of utilisation. Efficiency reaches 100% when output is equal to effective output.


 At this 100% efficiency level :


Utilisation = Actual output equal to effective capacity  / Designed capacity.


To raise utilisation beyond this level , effective capacity and actual output both are to be raised to as near designed capacity as possible. This may be achieved by removing the bottlenecks and hindrances in achieving higher effective capacity nearest to the designed capacity.


answered by: Tulsiram Garg
Add a comment
Answer #1

Maximum use of design capacity by proper planning can be done to achieve still higher levels of utilization.

answered by: ANURANJAN SARSAM
Add a comment
Know the answer?
Add Answer to:
operation management
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • cases of Thirty-five small communities in Connecticut (population near 10,000 each) gave an average of x...

    cases of Thirty-five small communities in Connecticut (population near 10,000 each) gave an average of x larceny per year. Assume that ơ is known to be 41.5 cases per year. 138.5 reported (a) Find a 90% confidence interval for the population mean annual number of reported larceny cases in such communities. What is the margin of error? (Round your answers to one decimal place.) lower limit 126.96 (15004 upper limit 50.04 margin of error (b) Find a 95% confidence interval...

  • The focus of chapter 14 is on the topic of Project Management as it relates to...

    The focus of chapter 14 is on the topic of Project Management as it relates to information technology projects. The key to any successful project is effective project management. The lack of good project management will likely lead to a series of setbacks such as cost overruns, time slippage, or poor technical performance among many other possibilities. Additionally, as the level of project complexity increases, the associated risk also becomes greater. Large enterprise projects are often complex and involve higher...

  • Thirty small communities in Connecticut (population near 10,000 each) gave an average of 138.5 reported cases...

    Thirty small communities in Connecticut (population near 10,000 each) gave an average of 138.5 reported cases of larceny per year. Assume that is known to be 42.1 cases per year. (a) Find a 90% confidence interval for the population mean annual number of reported larceny cases in such communities What is the margin of error? (Round your answers to one decimal place.) lower limit upper limit margin of error (b) Find a 95% confidence interval for the population mean annual...

  • Managing Technology Projects The focus of chapter 14 is on the topic of Project Management as...

    Managing Technology Projects The focus of chapter 14 is on the topic of Project Management as it relates to information technology projects. The key to any successful project is effective project management. The lack of good project management will likely lead to a series of setbacks such as cost overruns, time slippage, or poor technical performance among many other possibilities. Additionally, as the level of project complexity increases, the associated risk also becomes greater. Large enterprise projects are often complex...

  • 5. Suppose in the United States economy, the rate of money growth for the current year is 8 percent, the velocity of mon...

    5. Suppose in the United States economy, the rate of money growth for the current year is 8 percent, the velocity of money in circulation is constant, and inflation is expected to be about 2 percent over the current year. What is the short run economic growth rate? A) 16 percent B) 10 percent C) 8 percent D) 6 percent E) 4 percent 8. The fisher effect matters in terms of inflation given that A) borrowers agree to loan terms...

  • 1.) An industry is said to be a natural monopoly when: A. legal barriers limit entry...

    1.) An industry is said to be a natural monopoly when: A. legal barriers limit entry into the market. B. economies of scale are present in the market. C. the market demand for the product supplied by a firm is inelastic. D. long-run average cost continues to increase as the quantity of output increases. 2.) A monopoly: A. can increase price and increase output at the same time. B. can charge any price it wants and still sell all of...

  • In a study of the accuracy of fast food drive-through orders, Restaurant Ahad 281 accurate orders...

    In a study of the accuracy of fast food drive-through orders, Restaurant Ahad 281 accurate orders and 69 that were not accurate. a. Construct a 95% confidence interval estimate of the percentage of orders that are not accurate, b. Compare the results from part (a) to this 95% confidence interval for the percentage of orders that are not accurate at Restaurant B: 0.174<p <0.266. What do you conclude? a. Construct a 95% confidence interval. Express the percentages in decimal form....

  • In a study of the accuracy of fast food drive-through orders, Restaurant A had 340 accurate...

    In a study of the accuracy of fast food drive-through orders, Restaurant A had 340 accurate orders and 66 that were not accurate. a. Construct a 95% confidence interval estimate of the percentage of orders that are not accurate. b. Compare the results from part (a) to this 95% confidence interval for the percentage of orders that are not accurate at Restaurant B: 0.139 <p<0.211. What do you conclude? a. Construct a 95% confidence interval. Express the percentages in decimal...

  • In a study of the accuracy of fast food drive-through orders, Restaurant Ahad 265 accurate orders...

    In a study of the accuracy of fast food drive-through orders, Restaurant Ahad 265 accurate orders and 61 that were not accurate a. Construct a 95% confidence interval estimate of the percentage of orders that are not accurate b. Compare the results from part (a) to this 95% confidence interval for the percentage of orders that are not accurate at Restaurant B 0.167<p <0.244. What do you conclude? a. Construct a 95% confidence interval. Express the percentages in decimal form...

  • In a study of the accuracy of fast food​ drive-through orders, Restaurant A had 257 accurate...

    In a study of the accuracy of fast food​ drive-through orders, Restaurant A had 257 accurate orders and 58 that were not accurate.a. Construct a 90​% confidence interval estimate of the percentage of orders that are not accurate. b. Compare the results from part​ (a) to this 90​% confidence interval for the percentage of orders that are not accurate at Restaurant​ B: 0.164 < p < 0.234 What do you​ conclude? a. Construct a 90​% confidence interval. Express the percentages...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT