Answer:
a) The First Graph explaines well a bout the Phase Transition. According to the Phase diagram at one of the point one phase converts in to other phase.
In the second graph phase convertion point is not there and it does not seem the single compound Graph.
b) Second type of Transitions:
Example: Ferromagnetic - Diamagnetic transitions.
In the second type of transitions the first derivatives of thermodyamic potential by temperature are 0 and the second derivatives are not 0.
Observe the following diagrams for the standard molar change of a pure compound. determine Which diagrams...
What are the instruments that have been utilized for the
review article discussions?
`
1. Introduction In recent years, nanoclays have been the object of particular interest for many scientists and researchers in chemistry, physics, engineering and biology due to their excellent properties as well as their sustain- ability [1-3]. For instance, they represent the starting point to the de velopment of smart materials for drug delivery (4-9), food packaging [10-12), environmental remediation and wastewater treatment [13], cultural heritage [14–17and...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...
How can we assess whether a project is a success or a
failure?
This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...