ABC construction is planning to participate in bidding for a project. The estimated bid value prepared by the estimation and costing department
a. is the same as project estimated direct cost plus indirect cost. |
||
b. is only an estimate and will be negotiated if contract is awarded by government. |
||
c. has nothing to do with the type of contract. |
||
d. is possibly quite different from the estimate for the costs as it is driven by other factors as well. |
a. is the same as project estimated direct cost plus indirect cost.
Usually, the customers prefer to go for the bid price that is cheapest but at the same time, meets all the specifications of the contract as expressed by the customers. In this regard the bid price needs to be kept competitive by the contractors. In order to achieve the same, it could the same as project estimated direct cost plus indirect cost, for estimated bid price purpose.
ABC construction is planning to participate in bidding for a project. The estimated bid value prepared...
Scenario: Your organisation, ABC construction group has made a winning bid to construct a new manufacturing plant. The client expects the plant to be functional within a year. You are assigned as the Project Manager to ensure that the whole project stays on schedule. The two important conditions as per the client contract are:- ABC construction group will incur a penalty if the work is not completed by the deadline of 47 weeks from now. ABC construction group will be...
can
you please answer question 1 and 3 please
ABC General Contractors ABC General Contractors was an established construction company handling small-to medium- sized commercial and industrial construction projects. Some recent projects that the company had completed were a 20,000-square-foot factory building, a four-story office building, and a water filtration plant. TELEVISION TOWER BID The company was now in the process of preparing a bid for a television station for the erection of a 225-foot-high television antenna tower and the...
RADICO’S CHALLENGE The executive staff at Radico Corporation was quite pleased with the one-day training program they attended on the benefits of using agile and Scrum on some of their projects. Radico provided products and services to both public and private sector clients, almost all of it through competitive bidding. IT was not required for any of the products and services Radico provided. Agile and Scrum had proven to be successful on internal IT projects, but there were some concerns...
High-End Lifts uses a volume-based, plant-wide approach to
allocating overhead. They use direct-labor hours as the cost driver
for determining the budgeted rate. You will need to derive the
predetermined overhead rate for them. First few images are
information for the actual problems. Please help!!
Challenge 2: Job-Order Costing for Customized Work Based on your advice, High-End Lifts has moved forward and set up the production process to build all of its residential elevators in- house. In the past, High-End...
LO 2 8-47 Target costing Mercedes-Benz All Activity Vehicle (AAV)'3 Introduction During the recession beginning in the early 1990s, Mercedes-Benz (MB) struggled with product development, cost efficiency, material purchasing, and problems in adapting to changing mar- kets. In 1993, these problems caused the worst sales slump in decades, and the luxury car maker lost money for the first time in its history. Since then, MB has streamlined the core business, re- duced parts and system complexity, and established simultaneous engineering...
How can we assess whether a project is a success or a
failure?
This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...
Part II: Dana Boar, controller of Digital Electronics Canada, developed the figures requested by her boss and president of Digital Electronics Canada, Hans Fritz. The numbers allowed her to see how the projected sales volume for 2017 related to breakeven, and examine the relative profitability of the two products, DELTA1 and DELTA2. Boar thought the figures were OK as far has her analysis went, but she began to wonder about some of the assumptions built into her calculations. For example,...
Part II: Dana Boar, controller of Digital Electronics Canada, developed the figures requested by her boss and president of Digital Electronics Canada, Hans Fritz. The numbers allowed her to see how the projected sales volume for 2017 related to breakeven, and examine the relative profitability of the two products, DELTA1 and DELTA2. Boar thought the figures were OK as far has her analysis went, but she began to wonder about some of the assumptions built into her calculations. For example,...
I need Summary of this Paper i dont need long summary i need
What methodology they used , what is the purpose of this paper and
some conclusions and contributes of this paper. I need this for my
Finishing Project so i need this ASAP please ( IN 1-2-3 HOURS
PLEASE !!!)
Budgetary Policy and Economic Growth Errol D'Souza The share of capital expenditures in government expenditures has been slipping and the tax reforms have not yet improved the income...