Question

1.If a worker is exposed to 2 hours at 85 dBA, 1 hour at 90 dBA,...

1.If a worker is exposed to 2 hours at 85 dBA, 1 hour at 90 dBA, 4 hours at 88 dBA and 1 hour at 100 dBA, has the OSHA noise exposure standard been exceeded?

2. If a worker has been exposed for 2 hours at 95 dBA at the beginning of the workshift, for how many hours can the person be exposed to 100 dBA that same day?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1)
we know, OSHA's permissible exposure limit (PEL) is 90 dBA for all workers for an 8 hour day.

In one day maximum noice exposure = 90*8

= 720 dBA.hour

In the given case

noise exposure = 2*85 + 1*90 + 4*88 + 1*100

= 712 dBA.hour

clearly, 712 < 720

so, OSHA noise exposure standard not been exceeded.

2) let t is the required hours.

720 = 95*2 + 100*t

==> t = (720 - 95*2)/100

= 5.3 hours

Add a comment
Know the answer?
Add Answer to:
1.If a worker is exposed to 2 hours at 85 dBA, 1 hour at 90 dBA,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • a worker is exposed to an 8 hour twa noise exposure of 98 dba. what minimum...

    a worker is exposed to an 8 hour twa noise exposure of 98 dba. what minimum NRR would be needed to confidently ensure that the workers hearing protection would be below 85 dBA? (show all work)

  • A worker is exposed to: 90 dBA of noise for 4 hrs and 45 minutes, 92...

    A worker is exposed to: 90 dBA of noise for 4 hrs and 45 minutes, 92 dBA for 2 hrs and 15 minutes, and 9 5 dBA of noise for 1 hr. a). What is the value of TWAN ? __ __ b). Is the worker overexposed to noise (Yes or No)?

  • Suppose a worker is exposed to Dioxane and Carbon Dioxide during an 8-hour workday with the...

    Suppose a worker is exposed to Dioxane and Carbon Dioxide during an 8-hour workday with the times and concentrations listed below. What are the TWA's for each chemical exposure? Has the PEL has been exceeded for any individual chemical? Has the PEL has been exceeded for the combination of chemicals? What about the AL, has it been exceeded?

  • A worker was exposed over his shift to trichloroethylene. Four samples were measured during the 8-hour...

    A worker was exposed over his shift to trichloroethylene. Four samples were measured during the 8-hour workday. They are: 8:00 – 9:30                            17.5 mg/m3 9:30-11:30                             15.7 mg/m3 12:00 - 1:30                           18.5 mg/m3 2:30 - 4:30                            20.5 mg/m3 What is the PEL for this compound and was it exceeded? Given the following exposures to individual contaminants and their respective PELs, what is the combined exposure if the contaminants are considered additive?             Contaminant             Exposure (mg/m3)                PEL (mg/m3)                         X                                 150                                  ...

  • Example 5 Nuclear Incident A nuclear incident has exposed a 70kg worker to 1 Ci of 2 MeV photons for 1 minute. Ass...

    Example 5 Nuclear Incident A nuclear incident has exposed a 70kg worker to 1 Ci of 2 MeV photons for 1 minute. Assuming that all the energy of absorbed photons is deposited in the body with uniform distribution, what absorbed dose of radiation has the worker suffered? What effective dose? What would have been his effective dose if the exposure has been concentrated entirely in his stomach (mass 0.5kg)? Example 5 Nuclear Incident A nuclear incident has exposed a 70kg...

  • The graph shows the US Department of Labor noise regulation for working without ear protection. A...

    The graph shows the US Department of Labor noise regulation for working without ear protection. A machinist is in an environment where the ambient sound level is of 85 dB, i.e., corresponding to the 8 Hours/day noise level. The machinist likes to listen to music, and plays a Boom Box at an average level of 88.0 dB. a. Calculate the INCREASE in the sound level from the ambient work environment level (in dB). b. A student at a rock concert...

  • The graph shows the US Department of Labor noise regulation for working without ear protection. A...

    The graph shows the US Department of Labor noise regulation for working without ear protection. A machinist is in an environment where the ambient sound level is of 85 dB, i.e., corresponding to the 8 Hours/day noise level. The machinist likes to listen to music, and plays a Boom Box at an average level of 82.0 dB 6 2 90 95 85 105 100 Sound Level (dB) Calculate the INCREASE in the sound level from the ambient work environment level...

  • 1. Suppose that in an hour a German worker can produce 200 clothes or 20 cars,...

    1. Suppose that in an hour a German worker can produce 200 clothes or 20 cars, while a Japanese worker can produce 150 clothes or 10 cars. Each country has 8 hours available.        (a) Suppose that without trade the labour in each country spend 25% of their time producing clothes. How many clothes and cars would Germany produce?   2. Suppose that in an hour a German worker can produce 200 clothes or 20 cars, while a Japanese worker can...

  • A 70 kg laboratory worker is exposed to a 1.48 GBq 27 Co sou body has a cross sectional area of 1...

    A 70 kg laboratory worker is exposed to a 1.48 GBq 27 Co sou body has a cross sectional area of 1.5 m2 and is normally about 4 60 rce. Assume the person's .0 m from the source for hours per day. 27 Co emits y rays of energy 1.33 MeV and 1.17 MeV in quick succession. Approximately 50% of the rays interact with the body and deposit their energy. The rest just pass through (a) (b) What effective dose...

  • How many days would it take a crew to install 13,600 LF of base molding if...

    How many days would it take a crew to install 13,600 LF of base molding if they work five, eight-hour days per week and are able to install 100 LF of base molding per hour? How many days would it take a crew to install 13,600 LF of base molding if they work eleven-hour days, six days per week if their hourly productivity rate is 100 LF when not working overtime? Table 1: Production Efficiency Table for Use in Questions...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT