A worker is exposed to:
90 dBA of noise for 4 hrs and 45 minutes,
92 dBA for 2 hrs and 15 minutes, and 9
5 dBA of noise for 1 hr.
a). What is the value of TWAN ? __ __
b). Is the worker overexposed to noise (Yes or No)?
a)
The formula used for Dose
D = 100*(C1/T1 + C2/T2 +……Cn/Tn)
Here, we need to calculate the T values from the Tn Lookup table. We can get this from OSHA regulation documents/website. We can also use the formula T = 8/2^((L-90)/5) where L is the sound level. The values of C is the number of hours. So we have
C1 = 4.75, C2 = 2.25, C3 = 1
T1 = 8, T2 = 6.1, T3 = 4
D = 100*(4.75/8 + 2.25/6.1 + 1/4) = 121.26
Again we can use the TWA lookup table. However, we can also calculate it using the formula
TWA = 16.61 Log10(D/100) + 90
Using this we can calculate
TWA = 16.61*Log10(121.26/100)+90 = 91.39
b)
The OSHA standards allow for TWA <= 90.
Considering that the worker is exposed to 91.39, he/she is overexposed
A worker is exposed to: 90 dBA of noise for 4 hrs and 45 minutes, 92...
1.If a worker is exposed to 2 hours at 85 dBA, 1 hour at 90 dBA, 4 hours at 88 dBA and 1 hour at 100 dBA, has the OSHA noise exposure standard been exceeded? 2. If a worker has been exposed for 2 hours at 95 dBA at the beginning of the workshift, for how many hours can the person be exposed to 100 dBA that same day?
a worker is exposed to an 8 hour twa noise exposure of 98 dba. what minimum NRR would be needed to confidently ensure that the workers hearing protection would be below 85 dBA? (show all work)
At a manufacturing shop the noise exposure levels for an employee are as follows: 3 hours and 45 minutes at 90 dBA 2 hour and 15 minutes at 92 dBA 45 minutes at 95 dBA 30 minutes at 97 dBA 45 minutes without any noise What is the value of TWAN? 1.1900 0.1391 None of them is the answer 1.0021
A) Researchers are assessing the effects of ambient noise level and plant location on worker productivity by a two-factor ANOVA without replication, at alpha=0.05. The results are summarized below (some information is missing but can be worker out for the full information ANOVA table). The between rows (between plant locations) sum of squares must be: Source of Variation Sum of Squares Degrees of Freedom Mean Square F Statistic F Critical Value Plant location (row effect) 3 3.86 Noise Level( Column...
a worker submits the following data on a timesheet:week 1: total hours: 42 (including 4 hrs sick leave, 6 hrs travel)Week 2: total hours: 46 hours (including 5 hours travel)what percentage of the recorded time did the worker spemnd traveling?
On the average, members at a local fitness center work out for 90 minutes with a standard deviation of 15 minutes. The distribution is normal. 9. What percentage of the fitness club members work out for 45 minutes or less? What percent does that leave in each tail? 10. What percentage of fitness club members work out for 2 hours and 15 minutes or more? What percent does that leave in each tail?
Answer the following questions 92-99 For questions 92 and 93, refer to parallelogram MNOP. 92. ZPMN LNOP a. True b. False 93. PM ON a. True b. False 94. If CDEF is a rectangle and CD = 6, what is EF? a. 12 b. 6 C. d. 2 95. If MNOP is a square, what is a. 180 b. 135 MNP? c. 90 d. 45 96. If ABCD is a trapezoid with bases of lengths 14 m and 8 m,...
Direct materials (28 lbs. o $4 per lb.) Direct labor (8 hrs. $8 per hr.) Factory overhead-variable (8 hrs. $5 per hr.) Factory overhead-fixed (8 hrs. O $7 per hr.) $ 112.00 64.00 40.00 56.00 Total standard cost $ 272.00 The predetermined overhead rate is based on a planned operating volume of BOX of the productive capacity of 50,000 units per quarter. The following flexible budget information is available. Operating Levels 70% 35,000 280,000 80% 40,000 320,000 90% 45,000 360,000...
A company produces two products on two machines. •A unit of Product 1 requires 2 hrs on machine 1 and 1 hr on machine 2. •For Product 2, a unit requires 1 hr on machine 1 and 3 hrs on machine 2. •The profitper unit of Products 1 and 2 are $30 and $20, respectively. •The total weeklyprocessing time available for each machine is 80hrs. Question 1: Let x be the number of units produced for Product 1 and y...
A worker was exposed over his shift to trichloroethylene. Four samples were measured during the 8-hour workday. They are: 8:00 – 9:30 17.5 mg/m3 9:30-11:30 15.7 mg/m3 12:00 - 1:30 18.5 mg/m3 2:30 - 4:30 20.5 mg/m3 What is the PEL for this compound and was it exceeded? Given the following exposures to individual contaminants and their respective PELs, what is the combined exposure if the contaminants are considered additive? Contaminant Exposure (mg/m3) PEL (mg/m3) X 150 ...