Question

Lake Kickapoo, TX, is approximately 12 km in length by 2.5 km in width. The inflow for the month of March is 3.26 m/s and the outflow is 2.93 m*/s. The total monthly precipitation is 15.2 cm and the evaporation is 10.2 cm. The seepage is estimated to be 2.5 cm. Estimate the change in storage (in m3) during the month of March. 3

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Asea of lake 2. nlew 3.26 m3s otAow 2.43 m3)s Rarntall 15.2 m Seepage 2.5um -3.26 m3 3x24x60x6o 30 x 198 OUtAlow 0.20-0-2640-

Add a comment
Know the answer?
Add Answer to:
Lake Kickapoo, TX, is approximately 12 km in length by 2.5 km in width. The inflow...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 2. Hydrologic mass balance (20 points): Use a hydrologic mass balance to solve the following: a....

    2. Hydrologic mass balance (20 points): Use a hydrologic mass balance to solve the following: a. (10) A lake is approximately 15 km in length by 5 km in width. The inflow for the month of August is 3.5 m/s and the outflow is 2.15 m®/s. The total monthly precipitation is 20.5 cm and the evaporation is 8.2 cm. The seepage (infiltration) is estimated to be 1.35 cm. Estimate the change in storage (in mº) during the month of August....

  • Q2) (8 Marks) A) Estimate the constant rate of withdrawal (in m's) from a 13.75 km...

    Q2) (8 Marks) A) Estimate the constant rate of withdrawal (in m's) from a 13.75 km reservoir in a month of 30 days during which the reservoir level dropped by 0.75 m in spite of an average inflow into the reservoir of 0.5 Mm /day. During the month the average seepage loss from the reservoir was 2.5 cm, total precipitation on the reservoir was 18.5 cm and the total evaporation was 9.5 cm B) If the surface area of a...

  • Subject: Water Resource Engineering 9. A lake has a surface area of 850,000 m 2. For...

    Subject: Water Resource Engineering 9. A lake has a surface area of 850,000 m 2. For a given month (30 days), the lake has an inflow of 1.7 m23/s and an outflow of 1.3mA3/s. The water level in the lake was raised by 1.0 m. The total precipitation for the month is 23 cm. Assume that seepage loss is negligible. Determine the evaporation loss (in cm) for the lake

  • ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site...

    ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site on Gediz River in June 1971. Find the monthly evaporation in mm from the reservoir surface of this dam. If there were a Class A pan installed nearby the reservoir, what would be the monthly evaporation observed from this pan? Storage at the beginning of the month : 4XY.Z - 10 m Storage at the end of the month 47x V -10 m Average...

  • ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site...

    ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site on Gediz River in June 1971. Find the monthly evaporation in mm from the reservoir surface of this dam. If there were a Class A pan installed nearby the reservoir, what would be the monthly evaporation observed from this pan? Storage at the beginning of the month : 4XY.Z - 10 m Storage at the end of the month 47x V -10 m Average...

  • please my teachers Problem 1 (10 credits) A lake has an area of 10 km². During...

    please my teachers Problem 1 (10 credits) A lake has an area of 10 km². During a specific month the lake evaporation was 90 mm. During the same month the inflow to the lake from a river was on average 1.2 m/s and the outflow from the lake via another river was on average 1.1 m/s. Also, for the same month a water level increase of 100 mm for the lake was observed. a) What was the precipitation in mm...

  • ENGINEERING HYDROLOGY CIVL431 Assignment1 Problem 11 The following data were observed at Demirkopru Dam site on...

    ENGINEERING HYDROLOGY CIVL431 Assignment1 Problem 11 The following data were observed at Demirkopru Dam site on Gedir River in June 1971. Find the monthly evaporation in mm from the reservoir surface of this dam. If there were a Class A pan installed nearby the reservoir, what would be the monthly evaporation observed from this pan? Storage at the beginning of the month 4XY.X-10 m Storage at the end of the month 47XY -10 m Average surface area of reservoir in...

  • sovle it in understandable line please. thank you. Question 2- Surface area of a lake is...

    sovle it in understandable line please. thank you. Question 2- Surface area of a lake is 400 km' and annual precipitation is 32.5 cm. Inflow rate of stream is 2.54 m/s and outflow rate of stream is 2.67 m/s. Water surface level in the lake is increased by 22 mm during the year. Neglect the infiltration in the lake and compute the evaporation height in the lake for the related year.

  • During the month of March, the average river inflow to a reservoir is 3 m’/s while...

    During the month of March, the average river inflow to a reservoir is 3 m’/s while the dam bottom outlet releases 10 m²/s. Total rainfall for the month is measured as 20 mm uniformly distributed. The average seepage from the reservoir is estimated 0.5 m3/s. The surface areas of the lake are measured from aerial photos as 11.7 and 10.3 km2 and also the staff gauge readings of water surface are recorded as 107.2 m and 105.2 m in the...

  • Environmental Engineering Problems: The following prolems ar engineering and risk assessment. Read each problem carefully and...

    Environmental Engineering Problems: The following prolems ar engineering and risk assessment. Read each problem carefully and show information needed to solve the problems is provided in each supplemental information section at the end of the exam. To receive full credit, please clearly state your rationale and assumptions; include diagrams where appropriate. related to water resources I your work. The statement and in the problem と points) Use a hydrologic mass balance to solve the following: A small watershed is approximately...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT