Location | X-coordinate | Y-coordinate | Tonnage |
---|---|---|---|
Drop-off point A | 1 | 8 | 10 |
Drop-off point B | 6 | 7 | 35 |
Drop-off point C | 6 | 2 | 25 |
Drop-off point D | 4 | 7 | 50 |
Solution:
The center of gravity of the given four locations is calculated as,
X = Sum of (Xi x Tonnage) / Total tonnage
Y = Sum of (Yi x Tonnage) / Total tonnage
Total tonnage = 10 + 35 + 25 + 50 = 120
X = [(1 x 10) + (6 x 35) + (6 x 25) + (4 x 50)] / 120
X = 4.75
Y = [(8 x 10) + (7 x 35) + (2 x 25) + (7 x 50)] / 120
Y = 6.04
Answer: D. (4.75, 6.04)
A county wants to build one centrally-located processing facility to serve the county's four recycling drop-off...
Center of Gravity Method: East Texas Seasonings is preparing to build one processing center to serve its four sources of seasonings. The four source locations are at coordinates shown below. Also, the volume from each source is provided. What is the center of gravity? X-coordinate Y-coordinate Volume Athens, Texas 30 30 150 Beaumont, Texas 20 10 350 Carthage, Texas 10 70 100 Denton, Texas 50 50 200
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...