The problem is about the basic principles of engineering mechanics like drawing free body diagrams and writing equilibrium equations and finding out unknown forces and accelerations.
Answer is shown in pictures below.
Student ID: 7125990 a=7 b=1 c=2 d=5 e=9 f=9 g=0 the numbers above are plugged into...
(6 Points) - Problem 3: A 3000 kg truck is being used to lift a 800 kg boulder B that is on a 100 kg pallet A. Knowing that the acceleration of the rear wheel drive truck is 2 m/s", determine (a) the reaction at each of the front wheels. (b) the force between the boulder and the pallet. Im 0.6 m
The solution must contain an identification in words of the physical concept being applied (for example, conservation of momentum, kinematics, Coulomb’s Law, etc.) The solution must contain a general algebraic form (i.e., with no numbers inserted from the problem information) of each basic equation being applied. Thank you Rec. Inst. Name A green car with a mass of 900 kg is placed in the back of a yellow tow truck that has a pivot at one end. The car is...
Suppose that the 64-bit string A B C D E F 9 8 7 6 5 4 3 2 1 0 is obtained after the initial permutation in DES. Compute the 32-bit strings L1 and R1 knowing that the round key K1 is 0 1 2 3 4 5 6 7 8 9 A B.
e 18-19 - marder - (Alcala 302K_1) 0 1 2 3 4 5 6 7 9 kg What is the weight of the measuring stick if it is balanced by a support force at the 1 m mark? The acceleration of gravity is 9.81 m/s. Answer in units of N. 013 10.0 points An Atwood machine is constructed using two v-wheels (with the masses concentrated at the rims). The left wheel has a mass of 2.2 kg and radius 23.41...
DATA 1 ID X1 Y A 0 9 B 1 10 C 0 5 D 1 1 E 0 0 The zero order model is Ŷ = 8 − 2.5X1 1. What is the residual error in using the zero order model to predict Y for ID C? (Correct answer is -3, please show me how to find it) 2. What is the error in using the mean of Y to predict Y for ID C? (correct answer is -2,...
Consider the topology below with 9 hosts (A, B, C, D, E, F, G, H, 1), 4 switches (S1, S2, S3, S4) and 3 routers (R1, R2, R3). The numbers near links between routers R1, R2, R3 represent the cost of the respective link. В. С R 3 D E H b) Number the switch interfaces as you see fit (you can write the numbers on the figure), and assign MAC addresses to all of the adapters (you may simplify...
HERE IS THE SENSITIVITY REPORT!!!!!!!!! PLEASE SHOW ALL WORK A B C D E F G H J K M N O 1 Transportation Model (Basic) Use Solver on Data Ribbon to solve 2 3 Input Matrix: Destinations C D A 4 1 4 7 7 1 100 5 SUPPLY 8 8 2 12 3 200 6 5 3 10 16 150 7 90 80 120 160 8 Demand Required 10 Do not change or delete unshaded cells. 11 12...
To In the figure above, A=33, B=24,C=18, D=9, E-13, F-15, G=19, H=21. Tau In the figure above, A=33, B-24, C=18, D=9, E-13, F=15, G=19, H-21. If the government auctions off the quota licenses, what is the maximum amount of revenue it could raise?
(7) In this problem let X denote the vector space C(0, 1) with the sup norm. (a) Given f e X, define d(f) = f2. : X → X is differentiable, and Prove that φ find φ'(f). (b) Given f e X, define 9(f) = J0 [f(t)]2dt. Prove that Ψ : X → R is differentiable. and find Ψ(f). (7) In this problem let X denote the vector space C(0, 1) with the sup norm. (a) Given f e X,...
A=8 B=6 E=5 G=4 C=7 F=9 D=7 The following activities are part of a project to be scheduled using CPM. Determine the critical Path. How many weeks will it take to complete the project? Suppose F could be shortened by two weeks and B by one week. How would this affect the completion date? OBJECTIVE QUESTION 14 The following activities are part of a project to be scheduled using CPM. B-6 A-8 G-4 D-7 E-5 F-9 a. Determine the critical...