Table below is a time-phased net requirements for Widgets over the next six weeks along with the capacity constraint. Week 1

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Let's solve using excel

Model is shown below

fix X Week A1 A В C D Е F G Н J Week Prod 1 Req Саp Inv Setup cost Inv cost 2 1 335 600 -335 0 -100.5 600 -160.5 3 2 200 -535

The formulas are shown below

fx A1 Week A C D E G Week Prod Setup cost 1 Req Сар Inv Inv cost -IF(D2>0,200,0) -E2*0.3 2 1 335 600 D2-B2 -E2+D3-B3 =IF(D3>0

The parameters are shown below

fix Week Solver Parameters P Set Objective: A В C D E SBS10 Setup Week 1 Req Сар Prod Inv O Value Of: To: O Max O Min 2 1 335

The result is shown below. Answer is highlighted.

fx Week A1 A В C D F Н J Week Prod 1 Req Сaр Inv Setup costInv cost 2 1 335 600 335 0 200 0 600 3 2 200 200 0 200 0 Solver Re

Add a comment
Know the answer?
Add Answer to:
Table below is a time-phased net requirements for Widgets over the next six weeks along with...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please make sure the answer is correct 100% Exercise 2: The time phased net requirements for...

    please make sure the answer is correct 100% Exercise 2: The time phased net requirements for the base assembly are given as follows. Setup cost is $300, and the holding cost is $0.50 per assembly per week. Week 2 3 4 5 6 Req 250 150 140 400 200 200 a. Determine the lot sizes using Silver Meal heuristic. b. Determine the lot size using least unit cost heuristic.

  • manufacturing plng/ control 1. Suppose that your company sells a product for which the annual demand...

    manufacturing plng/ control 1. Suppose that your company sells a product for which the annual demand is 10,000 units. Holding costs are $1.00 per unit per year, and setup costs are $200 per order (a) What is the economic order quantity for your product? (b) What will be the annual total cost holding and ordering? 2. A company has currently 100 workers. A worker works 40 hours a week, and can at most work 20 hours of overtime per week....

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT