(a). Lot Sizing based on Silver Meal heuristic:

The purpose of Silver-Meal Heuristic is to calculate production quantities to meet the requirement of operations at minimum cost.

Under this, the Forward method is used calculate the average cost per period.

Formula for average cost :

C(j) = [k+hr2+2hr3+...+(j-1)hrj]/j, where

C(j) = average holding cost and setup cost per period

k = order or setup cost

h = holding cost

r = demand

I am explaining the steps to be used as follows:

Step 1: Start the calculation from period 1 to next period :

C(1) = k
C(2) = (k+hr2)/2
C(3) = (k+hr2+2hr3)/3 and so on.
Step 2: Stop the calculation when C(j)>=C(j-1).

Step 3: Find Lot size (1) = r1+r2+....+rj-1

Step 4: Repeat steps 1-3 for finding a lot size for the next period starting from the period in which you stopped earlier

using Silver-Meal Heuristic:

Using the values given in the question, we have

k=300$

r= (300,200,150,400,200,200)

h = 0.50 $

Starting in week 1 :

C(1) = 300
C(2) = (300+0.5*200)/2= 200
C(3) = (300+0.5*200+2*0.5*150)/3 = 183.33
C(4) = (300+0.5*200+2*0.5*150+3*0.5*400)/4 = 287.5
No further calculation as C(4)>C(3).

So, Lot size(1) = r1+r2+r3 = 300+200+150 = 650 units

The next step is to start over in week 4 again and the calculations are :

C(1) = 300 (for period 4 )
C(2) = (300+0.5*200)/2= 200 (for period 5 )
C(3) = (300+0.5*200+2*0.5*200)/3 = 200 ( for period 6 ) [Stop as C(4)>= C(3)]
So, Lot size(4) = r4+r5 = 400+200 = 600 units

Because week 6 is the last period, there is no need to start the process again.

And hence Lot size(6) = r6 = 200 units

\therefore  the lot sizes are = (650,0,0,600,0,200)

(b). Lot Sizing based on Least unit Cost heuristic:

The purpose of Least unit Heuristic is to minimize cost per unit of demand.

Formula for average cost :

C(j) = [k+hr2+2hr3+...+(j-1)hrj]/(r1+r2+....+rj), where

C(j) = average holding cost and setup cost per period

k = order or setup cost

h = holding cost

r = demand

I am explaining the steps to be used as follows:

Step 1: Start the calculation from period 1 to next period :

C(1) = k/r1
C(2) = (k+hr2)/r1+r2
C(3) = (k+hr2+2hr3)/r1+r2+r3, and so on.
Step 2: Stop the calculation when C(j)>=C(j-1).

Step 3: Find Lot size (1) = r1+r2+....+rj-1

Step 4: Repeat steps 1-3 for finding a lot size for the next period starting from the period in which you stopped earlier

using Least Unit Cost Heuristic.

Using the values given in the question, we have

k=300$

r= (300,200,150,400,200,200)

h = 0.50 $

Starting in week 1 :

C(1) = 300/300 = 1
C(2) = (300+0.5*200)/(300+200)= 0.8
C(3) = (300+0.5*200+2*0.5*150)/(300+200+150) = 0.846
No further calculation as C(3)>C(2).

So, Lot size(1) = r1+r2 = 300+200 = 500 units

The next step is to start over in week 3 again and the calculations are :

C(1) = 300/150=2 (for period 3 )
C(2) = (300+0.5*400)/(150+400)= 0.91 (for period 4 )
C(3) = (300+0.5*400+2*0.5*200)/(150+400+200) = 0.93 ( for period 5 ) [Stop as C(3)> C(2)]
So, Lot size(3) = r3+r4 = 150+400 = 550 units

The next step is to start over in week 5 again and the calculations are :

C(1) = 300/200=1.5 (for period 5 )
C(2) = (300+0.5*200)/(200+200)= 1 (for period 6 )
So, Lot size(5) = r5+r6 = 200+200 = 400 units

Note: As week 6 is the last week, no need to repeat the steps.

Also, the goal under “least unit cost” is to minimize cost per unit, and hence, Lot size (5) is calculated by adding the demand for week 5 and week 6 covering the demand for both.

\therefore the lot sizes are = (500,0,550,0,400,0)

Add a comment
Know the answer?
Add Answer to:
please make sure the answer is correct 100% Exercise 2: The time phased net requirements for...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Table below is a time-phased net requirements for Widgets over the next six weeks along with...

    Table below is a time-phased net requirements for Widgets over the next six weeks along with the capacity constraint. Week 1 2 3 4 5 6 Requirements 335 200 140 440 300 200 Capacity 600 600 600 400 200 200 The setup cost is $200 and the holding cost is $0.30 per unit per week. Accounting for the capacity constraint, the modified requirements schedule, with improvement step, is: Note: Enter your answer as integer. Week Requirement, y (Hint: You want...

  • please answer the question asap. 24. Given 150 units of on hand inverntory, a lead time of one period, an ordering cost of $400, and a holding cost of S$2 per unit per period, determine the lowest...

    please answer the question asap. 24. Given 150 units of on hand inverntory, a lead time of one period, an ordering cost of $400, and a holding cost of S$2 per unit per period, determine the lowest cost lot sizing technique among Lot for Lot, and EOQ Use the gross requirements as given in the tables. Calculate here: Lot for Lot Period # 250 350 200 406 450 Gross 170 165 Requirement On Hand Inventory Requirements order receipts order release...

  • 1. Consider the necessary information for an MRP application provided On hand Lead Time 24 32 80 ...

    1. Consider the necessary information for an MRP application provided On hand Lead Time 24 32 80 2) E(3 C(2 Requirements include 125 units (80 firm orders and 45 forecast)。亿in week 10 plus the follo wing spares 10 23 17 20 25 Develop the MRP table for this problem. 2) Consider the dynamic demand of an end item following the MRP explosion ess. Time Demand 50 30 20 80 100 The order cost (setup) per order is S125. Inventory carrying...

  • - Data Table for Problems 14.17 through 14.19* Period 1 2 3 4 5 6 7 8 9 10 11 12 requirements 30 ...

    please answer 14.17 - Data Table for Problems 14.17 through 14.19* Period 1 2 3 4 5 6 7 8 9 10 11 12 requirements 30 40 30 70 20 10 80 50 8 "Holding cost $2.50/unit/week; setup cost $150; lead time 1 week; beginning n Gross inventory 40 m14.17 Develop a lot-for-lot solution and calculate total rel- s evant costs for the data in the table for Problems 14.17 through d 14.19. Px 14.18 Develop an EOQ solution and...

  • 3. Consider the following Product Structure Data, Demand Data, Routing and Standard data for a company...

    3. Consider the following Product Structure Data, Demand Data, Routing and Standard data for a company that assembles two products, A and B. Product Structure Data | A B E (2 required) D Ε . (2 required) F (3 required) 3 required) Complete the following tables in order to determine the capacity requirements by using Capacity Bills method. (30 points) Routing and Standard Data End Product Lot Sizes Operation Work Center Standard Setup Hours Standard Production Hours per unit Standard...

  • have to minimize the cost than $1050 CHAPTER 14 MATERIAL ... 14.18 Develop a lot-for-lot solution...

    have to minimize the cost than $1050 CHAPTER 14 MATERIAL ... 14.18 Develop a lot-for-lot solution and calculate total relevant costs for the data in the preceding table. CHAPTER 14 MATERIAL ... 14.18 Develop a lot-for-lot solution and calculate total relevant costs for the data in the preceding table. se 12 fo he datam the prece in Develop costs for the De our answers for the 19, and 14.20 LEAD 14.18, 14.10 de Koster, or Rene M. de ka ywn...

  • supply chain question, please solve it anyone.

    There are two (2) Parts to this case.  The First part (Part 1) requires you to use the information to:1.    Build a Bill of Material (BOM) form the given information2.    Determine the Master Production Schedule (MPS) and3.    Complete the MRP for all parts including the product.   The Second Part (Part 2) will require you to use an indexed BOM to 1.    Create the correct MPS from the provided information2.    create the MRP for the unit and all of its assemblies/components Part 1:...

  • Obj. 4 ures. Five activities are used in ociated budgeted activity costs and cost per unit...

    Obj. 4 ures. Five activities are used in ociated budgeted activity costs and cost per unit for each prow EX 18-11 Activity rates and product costs using activity-based costing B. Dining room Garfield Inc, manufactures entry and dining room lighting fixtures. Five activitie lighting fixtures, manufacturing the fixtures. These activities and their associated budgeted activit $167.40 per unit activity bases are as follows: Budgeted Activity Activity Cost $560,000 EXCEL TEMPLATE 75,000 Inspecting 30,000 Setup 18,750 Materials handling Casting Assembly Activity...

  • Obj. 4 activities are used in ed activity costs and Number of inspections EX 18-11 Activity...

    Obj. 4 activities are used in ed activity costs and Number of inspections EX 18-11 Activity rates and product costs using activity-based costing ✓ B. Dining room Garfield Inc. manufactures entry and dining room lighting fixtures. Five activities lighting fixtures, manufacturing the fixtures. These activities and their associated budgeted activi $167.40 per unit activity bases are as follows: Budgeted Activity Activity Cost Activity Base Casting 5560,000 Machine hours EXCEL TEMPLATE Assembly 75,000 Direct labor hours Inspecting 30,000 Setup 18.750 Number...

  • Exercise 4-10 Contrasting ABC and Conventional Product Costs (L04-2, LO4-3, L04-4] Rocky Mountain Corporation makes two...

    Exercise 4-10 Contrasting ABC and Conventional Product Costs (L04-2, LO4-3, L04-4] Rocky Mountain Corporation makes two types of hiking boots-Xactive and Pathbreaker. Data concerning these two product lines appear below: points $ $ Xactive 64.80 18.20 1.4 DLHS 25,000 units Direct materials per unit Direct labor cost per unit Direct labor-hours per unit Estimated annual production and sales $ $ Pathbreaker 51.00 13.00 1.0 DLHS 75,000 units eBook The company has a conventional costing system in which manufacturing overhead is...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT