Flocculation tanks need to be sized to match three sedimentation basins 3.5 m deep and 6.0 m wide. The sedimentation basins e
0 0
Add a comment Improve this question Transcribed image text
Answer #1

3.m/ 60m Given flow through sedementation tank - sooo med G: ang velocity gradient = 35/sec. GE = 80,000. rotation speed dy pTemporal mean velocity gradient (e where pipower dissipated in watts (ie N.m/sec) u: absolute 61) dynamic viscosity Nshoz. V:

Add a comment
Know the answer?
Add Answer to:
ENV Water Supply Flocculation tanks need to be sized to match three sedimentation basins 3.5 m...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. A cross- flow, horizontal shaft, paddle-wheel flocculation basin is to be designed for a flow...

    1. A cross- flow, horizontal shaft, paddle-wheel flocculation basin is to be designed for a flow of 20.000 m ld a mean velocity gradient of 33.33 s (at 10 C), and a detention time of 45 min. The GT value should be from 50,000 to 100,000. Tapered flocculation is to be provided, and three compartments of equal depth in series are to be used, as shown in Figure 1. The G values determined from laboratory tests for the three compartments...

  • A water treatment plant is processing water at a flow rate of 1.5 m/s using three parallel treatm...

    A water treatment plant is processing water at a flow rate of 1.5 m/s using three parallel treatment trains. The detention times for the rapid mix tank, flocculation basin, and rectangular sedimentation basin are 10 sec, 30 min and 60 min, respectively. The velocity gradients for the rapid mix and flocculation tanks are 900 s and 60:40:20 s1, respectively. The viscosity of water is 0.001 Pa-s. (a) Determine the size and power requirements for rapid mix tanks. (b) Determine the...

  • A water treatment plant is to be designed to supply a daily flow of 35000 m/d....

    A water treatment plant is to be designed to supply a daily flow of 35000 m/d. The raw water is taken from a local river that has a turbid water. The main treatment units of this treatment plant are as illustrated in Figure 1: Screen River Water > Sedimentation Coagulation Flocculation Filtration Adsorption Adsor prion > Disinfection Storage Distribution Figure 1: Water treatment plant main unit The design criteria of each treatment unit is as follows: 1. Coagulation tanks (Rapid...

  • Using the values provided in Table 21-1, minimum sewage elevation in interceptor of 112.60 m, maximum...

    Using the values provided in Table 21-1, minimum sewage elevation in interceptor of 112.60 m, maximum sewage elevation in interceptor of 112.80 m, discharge elevation to stilling well of 116.40 m, an average design flow of 8,600 m3/d, peaking factor for peak hour of 2.8 and minimum factor of 0.49. A. Determine the most efficient screw pump diameter (in m) B. How many flights are recommended C. How many pumps are recommended in the final design? Typical/comment TABLE 21-1 Typical...

  • reply ma as soon as possible 120 points total Due: October 23, 2019 Budget your time...

    reply ma as soon as possible 120 points total Due: October 23, 2019 Budget your time carefully TRUE OR FALSE (45 points - 3 points cach): Mark whether the statements as written are "true" or "false". If the statement is false, make minor changes to the statement so that the statement is true. The primary adverse health effect resulting from the disposal of mercury wastes into Minamata Bay was dysentery The flow regime in horizontal velocity grit chambers approaches continuous...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

  • I got stuck on these two steps, can someone help me ? ACCOUNTING CYCLE STEP 3:...

    I got stuck on these two steps, can someone help me ? ACCOUNTING CYCLE STEP 3: Post each trans me general ledger working papers provideo teach transaction in the general journal to the general ledger. Use s provided in your packet. Posting is the process of transferring general journal entry information to the seneral ledger. Fach number you post should be properly Cross-referenced Helpful Hints by: recording the general journal page number (ex. G1, G2, etc.) in the Posting Reference...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT