Question

A water treatment plant is processing water at a flow rate of 1.5 m/s using three parallel treatment trains. The detention ti

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Date: /2019 TATA *iven Dan basin30in 40 eL AY) IW 900 00is P 12150 WaH 국(4), t..IS TATA PROJECTS Simplify Create

1201 d369m lp ΤΝΤΛ ทา 20 Asuming duphh BxBx 3 I.sx 30xKO В 42, 42m TATA PROJECTS Simplify CreateDate:)/o 12014 c) (15 x 60 x 10) = (SB) x B x 4 1349.86

nate4201 0001 Vo O.DO II トv., 90.1 95000 0.002 DD0ll XİDO ニ 100

Add a comment
Know the answer?
Add Answer to:
A water treatment plant is processing water at a flow rate of 1.5 m/s using three parallel treatm...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A water treatment plant is to be designed to supply a daily flow of 35000 m/d....

    A water treatment plant is to be designed to supply a daily flow of 35000 m/d. The raw water is taken from a local river that has a turbid water. The main treatment units of this treatment plant are as illustrated in Figure 1: Screen River Water > Sedimentation Coagulation Flocculation Filtration Adsorption Adsor prion > Disinfection Storage Distribution Figure 1: Water treatment plant main unit The design criteria of each treatment unit is as follows: 1. Coagulation tanks (Rapid...

  • The flocculation process in one treatment train at a surface water treatment plant is to be...

    The flocculation process in one treatment train at a surface water treatment plant is to be designed to treat a flow rate of 12 ML/d with a hydraulic detention time of 30 minutes. The flocculation basin should be divided into 4 equally sized stages with successively lower velocity gradients in each stage (that is, tapered flocculation). The velocity gradients in stages 1, 2, 3, and 4 should be 80, 65, 50, and 35 s−1, respectively. The water temperature is 15°C....

  • Ex. 4 A water treatment plant with a maximum daily flow of 3 m/s (1.5 times...

    Ex. 4 A water treatment plant with a maximum daily flow of 3 m/s (1.5 times the average flow) is treating a surface water. The water is coagulated with alum and the alum floc was measured to have a settling velocity of 2.2 m/h at 10 °C. Design a horizontal-flow rectangular sedimentation system based on the maximum day flowrate. Include the number of basins, dimensions and criteria checks.

  • Water and Wastewater Treatment SP-WATER TREATMENT PLANT SEDIMENTATION BASIN Design a rectangular, horizontal flow sedimentation process...

    Water and Wastewater Treatment SP-WATER TREATMENT PLANT SEDIMENTATION BASIN Design a rectangular, horizontal flow sedimentation process for a water treatment plant for turbidity removal Design Maximum Day Flow-20,000 m2ld Two parallel sedimentation tank, each designed for half of the total flow Depth 4.5 m, Width 6 m, Surface Overflow Rate 50 m/day Chain and flight sludge collector will be used, hence the limiting width of 6 m. Minimum Hydraulic Retention Time (detention time) 2 hrs Maximum weir rate 250 m/day/m...

  • A water treatment plant uses surface water as their source water. In order for the sedimentation...

    A water treatment plant uses surface water as their source water. In order for the sedimentation process to work properly, the water must be treated with coagulant. Upon measurement it was determined that the water contains 1.59x1010 particles/mL, the particles have an average diameter of 1.5 um, and the shearing is the dominant flocculation mechanism. The average temperature of the water is 25oC. The dosing point for the coagulant is in the rapid mix basin, which models a continuous mixed...

  • A new water treatment facility will be built to supply water to the town of Freemont. The town's ...

    Please help with this environmental engineering problem A new water treatment facility will be built to supply water to the town of Freemont. The town's population is currently 14,000 and the per capita water use is 100 gal per day. The new facility will be designed to account for increases in both per capita water use and population growth, and projections for water use will be determined for fifty years in the future. The population of the town of Freemont...

  • ENV Water Supply Flocculation tanks need to be sized to match three sedimentation basins 3.5 m...

    ENV Water Supply Flocculation tanks need to be sized to match three sedimentation basins 3.5 m deep and 6.0 m wide. The sedimentation basins each handle a flow of 5000 m/d, as will the flocculation tanks. The floc tanks will have two mixing sections with an overall average velocity gradient (G) of 35/s. The average velocity gradient-time (Gt) value has been set at 80,000. The paddles will be the wooden paddle-wheel type and will turn on a horizontal axis perpendicular...

  • If the settling velocity of a particle is 0.30 cm/s and the overflow rate of a...

    If the settling velocity of a particle is 0.30 cm/s and the overflow rate of a horizontal flow clarifier is 0.25 cm/s. 4. a. What percent of the particles are retained in the clarifier? b. If the flow rate is doubled, what percent removal of particles would be expected:? c. If a 1.0-m'/s flow water treatment plant uses 10 sedimentation basins with an overflow rate of 15 mld m2. what should be the surface area (m2) of each tank?

  • A drinking water treatment plant is designed with three sedimentation basins in parallel. Each basin is...

    A drinking water treatment plant is designed with three sedimentation basins in parallel. Each basin is designed with an overflow rate of 1,200 gpd/ft2 (gallons per day per square foot). (“In parallel” means that the flow is split evenly between the basins as shown below.) A. If the plant flow is 20 mgd (million gallons per day), find the plan area of each basin in square feet. B. Calculate the dimensions of the basins (length and width in feet) if...

  • You have been assigned the job of designing a rapid mix tank for a new water...

    You have been assigned the job of designing a rapid mix tank for a new water treatment plant. The design flow rate is 1.0 m3/sec. The average water temperature is 10 oC. The following design assumptions have been made: 1. Number of tanks = 1 (with 1 backup) 2. Tank configuration: Circular with liquid depth of 1.0m. 3. Detention time = 40 sec. 4. Velocity gradient = 750 s-1 Design the rapid mix by providing the following: a) Water power...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT