Question

Please help with this environmental engineering problem

A new water treatment facility will be built to supply water to the town of Freemont. The towns population is currently 14,0Question 3: Rapid and Slow Mix Design You have been assigned the job of designing rapid-mix and slow-mix tanks for the town o

A new water treatment facility will be built to supply water to the town of Freemont. The town's population is currently 14,000 and the per capita water use is 100 gal per day. The new facility will be designed to account for increases in both per capita water use and population growth, and projections for water use will be determined for fifty years in the future. The population of the town of Freemont grows at an average rate of 2% per year. Based on historic trends for the town of Freemont, per capita water use increases at a rate of 0.1% each year.
Question 3: Rapid and Slow Mix Design You have been assigned the job of designing rapid-mix and slow-mix tanks for the town of Freemont, using the groundwater aquifer as the water source. Design parameters for the rapid-mix tank: Detention time 2 mins No. of tanks: 2 velocity gradient (G) = 750 /s Impeller type: radial, with Np 3.6 Impeller diameters available 0.25, 0.5 and 1.0 m Tank length width B - Hwater/i3 Design parameters for the slow-mix tank: impeller: axial, Np = 0.40 Impeller diameters available: 1.0, 1.8 and 2.4 m Tapered G in 3 compartments: 90,60, 30 /s No. of tanks: 2 Detention time 30 min Tank length width B -Hwater/3 For both the rapid-mix and slow-mix tanks, determine: (i) Power input (assume 80% efficiency) (i) Tank dimensions Impeller diameter (iv) Rotational speed of the impeller H 1.85 x 105 Pa-s
0 0
Add a comment Improve this question Transcribed image text
Answer #1


ate 2oyears loo ates 50 yeans oo galfe OD 05 galda 9.xtd = 0173x2ー60 Volume d卜rapid-mix tank R= 1、51 m Huに 4.51 m Or Total towey input- 12529X2es 3 2 ng D.75 60 use imbeller Dia05m. 1.57 32.dl Volume vo3x 3oX m 2. LBH 155.2 m2P2 1209.2 watt ー-/512watt2. 2 1.54m 0.75 れ 2x 96. Ч3912p) 2 SI 1B2.2mY) 015m Go Rapid thi지 T4nK

Add a comment
Know the answer?
Add Answer to:
A new water treatment facility will be built to supply water to the town of Freemont. The town's ...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A new water treatment facility will be built to supply water to the town of Freemont. The town's ...

    A new water treatment facility will be built to supply water to the town of Freemont. The town's population is currently 14,000 and the per capita water use is 100 gal per day. The new facility will be designed to account for increases in both per capita water use and population growth, and projections for water use will be determined for fifty years in the future. The population of the town of Freemont grows at an average rate of 2%...

  • A new water treatment facility will be built to supply water to the town of Freemont. The town’s ...

    A new water treatment facility will be built to supply water to the town of Freemont. The town’s population is currently 14,000 and the per capita water use is 100 gal per day. The new facility will be designed to account for increases in both per capita water use and population growth, and projections for water use will be determined for fifty years in the future. The population of the town of Freemont grows at an average rate of 2%...

  • You have been assigned the job of designing a rapid mix tank for a new water...

    You have been assigned the job of designing a rapid mix tank for a new water treatment plant. The design flow rate is 1.0 m3/sec. The average water temperature is 10 oC. The following design assumptions have been made: 1. Number of tanks = 1 (with 1 backup) 2. Tank configuration: Circular with liquid depth of 1.0m. 3. Detention time = 40 sec. 4. Velocity gradient = 750 s-1 Design the rapid mix by providing the following: a) Water power...

  • Question #2 (25 points) A water treatment facility has 4 primary sedimentation tanks that operate in...

    Question #2 (25 points) A water treatment facility has 4 primary sedimentation tanks that operate in parallel. Each tank has the following dimensions: L: 55m, (length), W: 10.7m (width) and H: 3.0 m (depth) The tank each have a design capacity of 0.4 m”/s. Answer the following questions, a. What is the overflow rate (m/h)? b. What is the hydraulic detention time (h)? c. For spherical particles with a density of sand (2.65g/cm²), what is the smallest particle that is...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT