Question

Question #2 (25 points) A water treatment facility has 4 primary sedimentation tanks that operate in parallel. Each tank has

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Po=2.6592 1 Given, length L = 55m Height H=3m M=1.002x1ő kg my width B=10.7m design capacity ie flow rate Q=0.4 m2 @ over flo

Add a comment
Know the answer?
Add Answer to:
Question #2 (25 points) A water treatment facility has 4 primary sedimentation tanks that operate in...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A water treatment plant is processing water at a flow rate of 1.5 m/s using three parallel treatm...

    A water treatment plant is processing water at a flow rate of 1.5 m/s using three parallel treatment trains. The detention times for the rapid mix tank, flocculation basin, and rectangular sedimentation basin are 10 sec, 30 min and 60 min, respectively. The velocity gradients for the rapid mix and flocculation tanks are 900 s and 60:40:20 s1, respectively. The viscosity of water is 0.001 Pa-s. (a) Determine the size and power requirements for rapid mix tanks. (b) Determine the...

  • Problem 2 (20 points) You are hired to design a rectangular sedimentation tank (length to width...

    Problem 2 (20 points) You are hired to design a rectangular sedimentation tank (length to width ratio = 3:1 and detention time 2 h) for a new water treatment plant (flow rate: 0.04 m/s; temperature: 20 °C). Suspended particles can be removed when the overflow rate is higher than the settling velocities of particles. You have finished characterizing the influent particles (assuming all of them are spherical) and obtained the following results: Percentile Particle diameter (um) > 50 > 60...

  • Water and Wastewater Treatment SP-WATER TREATMENT PLANT SEDIMENTATION BASIN Design a rectangular, horizontal flow sedimentation process...

    Water and Wastewater Treatment SP-WATER TREATMENT PLANT SEDIMENTATION BASIN Design a rectangular, horizontal flow sedimentation process for a water treatment plant for turbidity removal Design Maximum Day Flow-20,000 m2ld Two parallel sedimentation tank, each designed for half of the total flow Depth 4.5 m, Width 6 m, Surface Overflow Rate 50 m/day Chain and flight sludge collector will be used, hence the limiting width of 6 m. Minimum Hydraulic Retention Time (detention time) 2 hrs Maximum weir rate 250 m/day/m...

  • You are hired to design a rectangular sedimentation tank (length to width ratio = 3:1 and...

    You are hired to design a rectangular sedimentation tank (length to width ratio = 3:1 and detention time ~ 2 h) for a new water treatment plant (flow rate: 0.04 m/s; temperature: 20 ). Suspended particles can be removed when the overflow rate is higher than the settling velocities of particles. You have finished characterizing the influent particles (assuming all of them are spherical) and obtained the following results: Particle diameter (m) Particle density (kg/m) Percentile 50 1.4 x 10...

  • You are hired to design a rectangular sedimentation tank (length to width ratio = 3:1 and...

    You are hired to design a rectangular sedimentation tank (length to width ratio = 3:1 and detention time ~ 2 h) for a new water treatment plant (flow rate: 0.04 m3/s; temperature: 20 ℃). Suspended particles can be removed when the overflow rate is higher than the settling velocities of particles. You have finished characterizing the influent particles (assuming all of them are spherical) and obtained the following results: Particle diameter (m) Particle density (kg/m3) Percentile 50 1.4 x 103...

  • You are hired to design a rectangular sedimentation tank (length to width ratio = 3:1 and...

    You are hired to design a rectangular sedimentation tank (length to width ratio = 3:1 and detention time ~ 2 h) for a new water treatment plant (flow rate: 0.04 m3/s; temperature: 20 ℃). Suspended particles can be removed when the overflow rate is higher than the settling velocities of particles. You have finished characterizing the influent particles (assuming all of them are spherical) and obtained the following results: Particle diameter (μm) Particle density (kg/m3) Percentile ≥ 50 ≥ 1.4...

  • A new water treatment facility will be built to supply water to the town of Freemont. The town's ...

    Please help with this environmental engineering problem A new water treatment facility will be built to supply water to the town of Freemont. The town's population is currently 14,000 and the per capita water use is 100 gal per day. The new facility will be designed to account for increases in both per capita water use and population growth, and projections for water use will be determined for fifty years in the future. The population of the town of Freemont...

  • A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process...

    A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process followed by conventional activated sludge process composed of covered aeration tanks and secondary clarifiers. You are asked to calculate the different operation parameters to make sure that the system is operated within normal process ranges listed in the reference tables below. Table 5-20 Typical design information for primary sedimentation tanks U.S. customary units Item Unit Range Typical Primary sedimentation tanks followed by secondary treatment...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT