Please ignore the numbers in the boxes with the red mark on it, I got them wrong. Please be kind and answer both!!!
Question 1:
Question 2:
1. for the system given we can draw the inequalities on a graph as
so we get vertex point for the
common region at
now giving this points to profit function ,
at (0,230.77) we get
at (166.67,0) we get
so the optimal solution is to produce 0 laserstop models and 230.77 speedbuster models .This solutions gives the maximum possible profit which is $31153.82
Since the optimal solution is (0,230.77) it lies on the line of component A so it is a binding constraint ,
for component B we get
Component A is a binding constraint and it has 0 slack
Component B is not a binding constraint and it has 653.85 slack
2. on graphing we get
we get vertex points at
(0,15.79) and (30,0) ,
giving this point to profit function
at (0,15.79)
at (30,0)
so the optimal solution is to produce 30 standard desks and 0 deluxe desks , this solution gives the maximum possible profit which is $7500
availability of pine is not a binding constraint and it has slack
availability of oak is not a binding constraint and it has 800 slack
availability of labour is a binding constraint and it has 0 slack
Please ignore the numbers in the boxes with the red mark on it, I got them...
Problem 3-12 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $69, 91, and $127, respectively. The production requirements per unit are as follows: Number ofNumber of Manufacturing Fans Cooling Coils Time (hours) Economy 8 Standard 12 Deluxe 14 4 For the coming production period, the company has 200 fan motors, 340 cooling coils, and 2800 hours of manufacturing time available. How many economy models...
Problem 3-12 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $67, $93, and $129, respectively. The production requirements per unit are as follows: Number of Manufacturing Number of Cooling Coils Time (hours) Fans Economy Standard 12 Deluxe 14 For the coming production period, the company has 250 fan motors, 360 cooling coils, and 1800 hours of manufacturing time available. How many economy models (E),...
Problem 3-12 (Algorithmic) uality Air Conditioning manufactures three home air conditioners: an economy mode a standard model and a deluxe mo e The profits per nit are S,, 4 , and respectively. The production requirements per unit are as follows: Number of Number of Manufacturing Cooling Coils Time (hours) Fans Economy 8 Standard 12 Deluxe 4 14 For the coming production period, the company has 320 fan motors, 380 cooling coils, and 3200 hours of manufacturing time available. How many...
An Air Conditioning manufactures three varieties of home air conditioners: an economy model, a standard model, and a deluxe model. The profit per unit is SAR 63, 95, and 135, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 200 fan motors, 320 cooling coils, and 2400 hours of manufacturing...
2. In a Air Conditioning manufacturing problem, the firm is maximizing the profit by selling three different products. Linear programming model for this problem will be as follows: Decision Variables: E := Number of economy models to be produced S := Number of standard models to be produced D := Number of deluxe models to be produced Linear Program: max 68E + 86S + 118D s.t. E + S + D ≤ 230 (Fan Motors) E + 2S + 4D...
12. a-d and 13. a-d
12. Quality Air Conditioning manufactures three home air conditioners: an cconomy model a standard model, and a deluxe model. The profits per unit are S63-995, and $135, np tively. The production requirements per unit are as follows Number of Fans Number of Cooling Cods Manufacturing Time hours Standard Deluxe 12 14 For the coming production period, the company has 200 fan motons, 320 cooling coils and 2400 hours of manufacturing time available. How many ecconomy...
Problem 3-13 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $59, $89, and $137, respectively. The production requirements per unit are as follows: Number of Fans Number of Cooling Coils Manufacturing Time (hours) Economy 1 1 8 Standard 1 2 12 Deluxe 1 4 14 For the coming production period, the company has 240 fan motors, 380 cooling coils, and 2500 hours of manufacturing...
how
to solve this
of fans is now 170? Can we speculate the new profit value 9. If the number of cooling coils is now 420, what is the new profic? Bags Production problem ht Hand Side easibility) A manufacturer produces 3 models of bags: A, B and C. Constraints limitations (time available in minutes) in each of the 3 There is also one more constraint that requires the m A. The linear programmin production capacity Cutting, Sewing, and Packaging...
#5 urgent need now
Linear Programming: 4. Kings Department Store has 625 nubies, 800 diamonds, and 700 emeraids from which they will make bracelets and necklaces that they have advertised in their Christmas brochure. Each of the rubies is approximately the same size and shape as the diamonds and the emeralds Kings will net a profit of S250 on each bracelet, which is made with 2 nubies, 3 diamonds, and 4 emeralds, and $500 on each necklace, which includes 5...