Question

QUESTION 1

A new production system for a factory is to be purchased and installed for $150,450. This system will save approximately 300,000 kWh of electric power each year for a 6-year period. Assume the cost of electricity is $0.10 per kWh, and factory MARR is 15% per year, and the salvage value of the system will be $8,488 at year 6. Using the PW method to analyzes if this investment is economically justified 

A- calculate the PW of the above investment and insert the result below. 

B- Based on the PW value you got in the previous question, is this investment economically  justified or not? type you explanation below 

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 7 more requests to produce the answer.

3 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
QUESTION 1
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • question 1 HW7

    A new production system for a factory is to be purchased and installed for $175,812. This system will save approximately 300,000 kWh of electric power each year for a 6-year period. Assume the cost of electricity is $0.10 per kWh, and factory MARR is 15% per year, and the salvage value of the system will be $8,172 at year 6. Using the AW method to analyzes if this investment is economically justified A- calculate the AW of the above investment and insert the result...

  • QUESTION 1 A new production system for a factory is to be purchased and installed for...

    QUESTION 1 A new production system for a factory is to be purchased and installed for $177,896. This system will save approximately 300,000 kWh of electric power each year for a 6-year period. Assume the cost of electricity is $0.10 per kWh, and factory MARR is 15% per year, and the salvage value of the system will be $9,551 at year 6. Using the AW method to analyzes if this investment is economically justified A- calculate the AW of the...

  • 2) A retrofitted space-heating system is being considered for a small office building. The system can...

    2) A retrofitted space-heating system is being considered for a small office building. The system can be purchased and installed for $110,000. Due to improved efficiency, it will require less electric power than the current system each year over a six-year period. The market value of the system will be $20,000 at the end of six years. A kWh of electricity costs $0.10, and the company uses a MARR of 15% per year. What are the minimum electrical savings in...

  • A medium scale (125 kW installed capacity) PV solar project costs $450,000 and has 200 MWh...

    A medium scale (125 kW installed capacity) PV solar project costs $450,000 and has 200 MWh estiamted annual energy production value in Charlotte NC. The electricity is sold to the grid at $ 0.15 / kWh, paid at the location of solar system (no transmission cost). The project has a 20 year time horizon with salvage value of $ 22 thousand, and the MARR is 6 %. 1. a. Calculate the NPV of the project. b. Indicate if the project...

  • Problem 6-16 (algorithmic) Question Help A special-purpose 30-horsepower electric motor has an efficiency of 90%. Its...

    Problem 6-16 (algorithmic) Question Help A special-purpose 30-horsepower electric motor has an efficiency of 90%. Its purchase and installation price is $2,100. A second 30-horsepower high-efficiency motor can be purchased for $3,100, and its efficiency is 94%. Either motor will be operated 3,500 hours per year at full load, and electricity costs $0.09 per kilowatt-hour (kWh). MARR = 12% per year, and neither motor will have a market value at the end of the eight-year study period a. Which motor...

  • A special-purpose 30-horsepower electric motor has an efficiency of 90%. Its purchase and installation price is...

    A special-purpose 30-horsepower electric motor has an efficiency of 90%. Its purchase and installation price is $2,200. A second 30-horsepower high-efficiency motor can be purchased for $3,200, and its efficiency is 92%. Either motor will be operated 4,000 hours per year at full load, and electricity costs $0.10 per kilowatt-hour (kWh). MARR = 12% per year, and neither motor will have a market value at the end of the eight-year study period. a. Which motor should be chosen? b. For...

  • anyone can check my answer? Student Name: QUID: Section: Question 1 (6pts). For the cash flows...

    anyone can check my answer? Student Name: QUID: Section: Question 1 (6pts). For the cash flows shown below, answer the following questions. (Assume MARR = 15% (1) (2pts) Provide the equation using PW to find the ROR of the cash flow given. (2) (2pts) Decide whether the project is acceptable or not using RATE function in MS Excel. Provide the screenshot (3) (2pts) Decide whether the project is acceptable or not using IRR_function in MS Excel. Provide the screenshot Year...

  • Question The developer and owner of a shopping mall is planning to install solar PV panels...

    Question The developer and owner of a shopping mall is planning to install solar PV panels on the roof top. Project Costs: The 100-kw system will cost $225,000 to install on 600 m2 of space available on the roof top. It will have a useful life 20 years and a salvage value of $2,000. Annual operations and maintenance cost will be $1,500. Energy output: Based on Singapore weather conditions, the system is capable of producing 170,000 kwh of electricity in...

  • The developer and owner of a shopping mall is planning to install solar PV panels on...

    The developer and owner of a shopping mall is planning to install solar PV panels on the roof top. Project Costs: The 100-kw system will cost $225,000 to install on 600 m2 of space available on the roof top. It will have a useful life 20 years and a salvage value of $2,000. Annual operations and maintenance cost will be $1,500. Energy output: Based on Singapore weather conditions, the system is capable of producing 170,000 kwh of electricity in the...

  • 4.12 Biomet Implants is planning new online patient diagnostics for surgeons while they operate. The new...

    4.12 Biomet Implants is planning new online patient diagnostics for surgeons while they operate. The new system will cost $300,000 to install in an operating room $5,000 annually for maintenance, and have an expected life of 4 years. The revenue per system is estimated to be $80,000 in year 1 and to increase by $10,000 per year through year 4. Determine if the project is economically justified using PW analysis and a MARR of 10% per year 4.16 Halogen-free liquid...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT