Q3) As shown in the opposite photo, the raised open-sided platform is 2 meters above adjacent floor or ground level (4 marks)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Safety Measures to Prevent Falling Accidents

  1. Guardrail systems
  2. Safety Nets
  3. Warning lines
  4. Personal Fall Arresting System(Lanyard)
  5. adequate and good wooden plank on top of platfrom.
  6. safe access to platform and supporting structure.
  7. Adequate Cross bracing and footing foundation.
  8. Not to be overloaded

Specifications:
1.Guardrails ( for the Structure 6 ft or above)

  • Top rail =42"
  • Mid rail =21"
  • Vertical Distances=19" Max
  • Toe Board=6"min
  • Horizontal loading =200lbs Min

2.Safety Nets:

  • Catching width = 2.0 m (recommended 3.5m)
  • Distance between anchorage points=2.5 m or less
  • Falling height = 6ft

3.Lanyard (Personal Fall Arresting System)

Parts: Anchor points,Body support(Harness),Lanyard(Connecting device)

  • Anchorage points Minimum= 2
  • chest attachment point =2
  • length of lanyard = 2m or required for fall protection
  • safety factor = 1m or min 3 ft
  • well anchorage points

4.General

  • Temporary structure to be on firm foundation with base plates and to be plumb, square and adequately braced with planked work deck
  • Supports and braces to Be tied in over 4 Vert./1 Horizontal high



Add a comment
Know the answer?
Add Answer to:
Q3) As shown in the opposite photo, the raised open-sided platform is 2 meters above adjacent...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • summarizr the followung info and write them in your own words and break them into different...

    summarizr the followung info and write them in your own words and break them into different key points.   6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...

  • summatize the following info and break them into differeng key points. write them in yojr own...

    summatize the following info and break them into differeng key points. write them in yojr own words   apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT