Question

3. The large piece of concrete slab of dimension 1m x 2m weigh 100 kg. The drying curve for the concrete slab is as shown in

0 0
Add a comment Improve this question Transcribed image text
Answer #1

so:- Given data are - concrete slab of dimension IMX 2M Weight (w) = 100kg initiay moisture content (x1) = 0.9 finas moisturhere some values taken from given graph and drying time calculate.calculation is done with the help of scientific calculator.

Add a comment
Know the answer?
Add Answer to:
3. The large piece of concrete slab of dimension 1m x 2m weigh 100 kg. The...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please show all calculation step-by-step and sketch 3.4 In order to test the feasibility of drying...

    please show all calculation step-by-step and sketch 3.4 In order to test the feasibility of drying a certain foodstuff, drying data were obtained in a tray dryer with air flow over the top exposed surface having an area of 0.186 m². The bone-dry sample weight was 3.765 kg dry solid. At equilibrium after a long period, the wet sample weight was 3.955 kg H2O + solid. Hence, 3.955 - 3.765, or 0.190, kg of equilibrium moisture was present. The following...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT