In the site development process approximately 400,000 bcy of soil material (sandy clay) must be cut...

In the site development process approximately 400,000 bcy of soil material (sandy clay) must be cut from one area in a new shopping mall site and used as fill in another area. The average distance between cut and fill is 700 ft. Which of the following equipment items is best for this work?

a. D9 Caterpillar Dozers with Universal Blade

b. 4-cy wheel loader and 24-cy off-road dump trucks

c. 22-cy self-loading Scrapers

d. 3-cy tracked Hoe and 18-cy on-road dump trucks

0 0
Add a comment Improve this question Transcribed image text
Answer #1

A "22-cy self loading scraper" is the best equipment for this work.

Because, the distance between cutting site and filling site is very less. Generally hoe and dump trucks are used for this kind of work. but here, a scraper can do cutting as well as dumping operation simulteniously. One equipment can do multiple kind of work and excess equipments are avoided.

Add a comment
Know the answer?
Add Answer to:
In the site development process approximately 400,000 bcy of soil material (sandy clay) must be cut...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Please help, show work. ETCM 4330 To develop the Blue Creek mine site, a wash pit...

    Please help, show work. ETCM 4330 To develop the Blue Creek mine site, a wash pit area needs to be developed on the east side of the overburden. The area is shown on th Assignment #2 g area has been leased on the south side of the site to stock pile e map. A road must be built to transport materials to the temporary working area using materials from the pit excavation. be 20' wide and 4000' long. The existing...

  • Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem...

    Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...

  • Part 2 Based upon the results to part 1, the project requires hauling materials to, or...

    Part 2 Based upon the results to part 1, the project requires hauling materials to, or from, the site. The following equipment is available for earthwork operations: - One 5-cy heaped capacity bucket loader; a 0.5 min cycle time; 90% fill capacity. - One 7-cy heaped capacity bucket loader; a 0.6 min cycle time; 90% fill capacity. 45.9-cy heaped capacity off-road trucks; a 0.5 min dump time; 100% fill capacity. - Loaded trucks travel through the following three sections: Haul...

  • Part 1 Complete the following Earthwork Sheet Material: Earth and Gravel, Swell Factor: 83 Strip fill(cy...

    Part 1 Complete the following Earthwork Sheet Material: Earth and Gravel, Swell Factor: 83 Strip fill(cy Total till och Total cut beyl Adj fill (byl Sum (beyl Mass ordinate 1.23 056 2.37 1.20 2.36 3.07 3.60 3.77 3.09 3.01 4.65 Strip cut (boyil 0.04 1.04 097 3.22 2.08 2.33 2.51 1.85 161 1.74 0.88 109 35.70 5.58 18 3.12 2.03 6.77 2.01 2.53 0.82 1.08 1.20 1.92 1.59 1.82 3.95 3.25 2.74 150 7.42 556 80 End-area End area cut...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT