Stage 1 ABC For Machine Shop: Assigning Costs to Activity
As the chief engineer of a small fabrication shop, Brenda
Tolliver refers to herself as a "jack-of-all-trades."
When an order for a new product comes in, Brenda must do the
following:
Each time the foundry manufactures a batch of the product, Brenda must perform these activities:
Brenda supervises the production employees who perform the actual work on individual units of product. She is also responsible for employee training, ensuring that production facilities are in proper operating condition, and attending professional meetings. Brenda's estimates (in percent) of time spent on each of theses activities last year are as follows:
Unit level activities: | |
Supervising production | 26% |
Batch level activities: | |
Scheduling jobs | 19% |
Supervising setups | 6% |
Inspecting first units | 2% |
Product level activities: | |
Designing product | 11% |
Preparing bills of materials | 2% |
Preparing operations lists | 6% |
Facility level activities: | |
Training employees | 16% |
Maintaining facility | 8% |
Attending professional meetings | 4% |
100% |
Assuming Brenda Tolliver's salary is $125,000 per year, determine the dollar amount of her salary assigned to unit-, batch-, product-, and facility-level activities.
% of Time Spent on Activity |
Assignment of Salary |
|
---|---|---|
Unit level: | ||
Supervising production | Answer | |
Total | Answer | Answer |
Batch level: | ||
Job scheduling | Answer | |
Supervising setup | Answer | |
First unit inspection | Answer | |
Total | Answer | Answer |
Product level: | ||
Product design | Answer | |
Preparing bills of materials | Answer | |
Preparing operations lists | Answer | |
Total | Answer | Answer |
Facility level: | ||
Employee training | Answer | |
Facility maintenance | Answer | |
Attending professional meetings | Answer | |
Total | Answer | Answer |
Grand total | Answer | Answer |
Unit level activities: | ||
Supervising production | 26% | $ 32,500 |
Total | 26% | $ 32,500 |
Batch level activities: | ||
Scheduling jobs | 19% | $ 23,750 |
Supervising setups | 6% | $ 7,500 |
Inspecting first units | 2% | $ 2,500 |
Total | 27% | $ 33,750 |
Product level activities: | ||
Designing product | 11% | $ 13,750 |
Preparing bills of materials | 2% | $ 2,500 |
Preparing operations lists | 6% | $ 7,500 |
Total | 19% | $ 23,750 |
Facility level activities: | ||
Training employees | 16% | $ 20,000 |
Maintaining facility | 8% | $ 10,000 |
Attending professional meetings | 4% | $ 5,000 |
Total | 28% | $ 35,000 |
Grand Total | 100% | $ 125,000 |
Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a...
QUESTION 1 Incomplete answerMarked out of 5.00P lag Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a small fabrication shop, Brenda Tolliver refers to herself as a "jack-of-all-trades." When an order for a new product comes in, Brenda must do the following: 1. Design the product to meet customer requirements 2. Prepare a bill of materials (a list of materials required to produce the product). 3. Prepare an operations list (a sequential list...
Exercise 4-1 ABC Cost Hierarchy (L04-1] The following activities occur at Greenwich Corporation, a company that manufactures a variety of products: Required: Classify each of the activities below as either a unit-level, batch-level, product-level, or facility-level activity. Activity Classification Activity a. Various individuals manage the parts inventories. b. A clerk in the factory issues purchase orders for a job. c. The personnel department trains new production workers. d. The factory's general manager meets with other department heads to coordinate plans....
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs: Setup (1,000 setup hours) $118,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 150,000 Supervision (2,000 direct labor hours) 46,000 Machine maintenance (12,000 machine hours) 60,000 Total activity costs $434,000 The following additional data were provided for Job 845: Direct materials costs $7,000 Direct labor cost (5 Milling direct labor hours;35 Finishing direct labor hours) $1,000 Setup hours 5...
After reading an article about activity-based costing in a trade journal for the furniture industry, Santana Rey wondered if it was time to critically analyze overhead costs at Business Solutions. In a recent month, Santana found that setup costs, inspection costs, and utility costs made up most of its overhead. Additional information about overhead follows. Activity Setting up machines Inspecting components Providing utilities Cost $21,750 $5,300 $10,600 Driver 25 batches 5,300 parts 5,300 machine hours Overhead has been applied to...
Check my After reading an article about activity-based costing in a trade journal for the furniture industry, Santana Rey wondered if it was time to critically analyze overhead costs at Business Solutions. In a recent month, Santana found that setup costs, inspection costs, and utility costs made up most of its overhead. Additional information about overhead follows. Activity Setting up machines Inspecting components Providing utilities Cost $20,000 $ 7,500 $10,000 Driver 25 batches 5,000 parts 5,000 machine hours Overhead has...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following activities and costs: Setup (1,000 setup hours) $ 146,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 90,000 Supervision (2,000 direct labor hours) 56,000 Machine maintenance (12,000 machine hours) 96,000 Total activity costs $ 448,000 The following additional data were provided for Job 845: Direct material costs $ 8,000 Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours)...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following activities and costs: Setup (1,000 setup hours) $ 146,000 Production scheduling (400 batches) 60,000 Production engineering (60 change orders) 90,000 Supervision (2,000 direct labor hours) 56,000 Machine maintenance (12,000 machine hours) 96,000 Total activity costs $ 448,000 The following additional data were provided for Job 845: Direct material costs $ 8,000 Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours)...
Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Production Activity Indirect Labor Indirect Materials Other Overhead Grinding $ 370,000 Polishing $ 110,000 Product modification 600,000 Providing power $ 265,000 System calibration 410,000 Additional information on the drivers for its production activities follows. Grinding 11,000 machine hours Polishing 11,000 machine hours Product modification 2,100 engineering hours Providing power 21,000 direct labor hours System calibration 1,000 batches Job...
Calculating Activity-Based Costing Overhead Rates Assume that manufacturing overhead for Glassman Company consisted of the following activities and costs: Setup (1,000 setup hours) $160,000 Production scheduling (400 batches) 76,000 Production engineering (60 change orders) 120,000 Supervision (2,000 direct labor hours) 56,000 Machine maintenance (12,000 machine hours) 84,000 Total activity costs $496,000 The following additional data were provided for Job 845 Direct materials costs $11,000 Direct labor cost (5 Milling direct labor hours; 35 Finishing direct labor hours) $5,000 Setup hours...
Two-Stage ABC for Manufacturing Assume Sherwin-Williams Company, a large paint manufacturer, has determined the following activity cost pools and cost driver levels for the latest period: Activity Cost Pool Activity Cost Activity Cost Driver Machine setup 5900,000 2,500 setup hours Material handling 820.000 4.000 material moves Machine operation 400,000 20,000 machine hours The following data are for the production of single batches of two products, Mirlite and Subdue: Mirlite Subdue Gallons produced 60.000 25,000 Direct Isbor hours 400 250 Machine...