In a winch assembly plant at Curt Manufacturing, the winch assembly work cell for the winch mount handle has a demand of 200 units an hour. Two feeder cells supply the two winch component parts CRT31005 and CRT 31006 to the assembly cell (one CRT31005 and one CRT31006 for each winch mount handle). Standard containers will hold 20 CRT31005’s or 10 CRT31006’s. It takes 10 minutes to fill up a container with CRT31005’s and 20 minutes to full up a container with CRT31006’s. The transit time to the assembly work cell is 5 minutes for both CRT31005 and CRT31006; the policy variable set by management that reflects possible inefficiency in the system is 0. . Set up a Kanban control system for the assembly process.
Where K = Number of Kanbans required
d = average production rate per day
w = waiting time in fractions of a day
p = processing time in fractions of a day
c = capacity of container
= efficiency of process
For CRT31005:
d = 200*24 = 4800
w = 10/(60*24) = 0.00694
p = 5/(60*24) = 0.0347
c = 20
= 0
K = = 10 Kanbans
For CRT31006:
d = 200*24 = 4800
w = 20/(60*24) = 0.01388
p = 5/(60*24) = 0.0347
c = 10
= 0
K = = 23.3 Kanbans (rounding up to 24)
Thus,
CRT31005 requires 10 Kanbans
CRT31006 requires 24 Kanbans
In a winch assembly plant at Curt Manufacturing, the winch assembly work cell for the winch...
The welding department supplies parts to the final assembly line. Management decides to implement a kanban system and has collected the following data. The daily demand is 2,600 units. The production lead time is 6 days (this includes processing time, transport time, and waiting time). Management has decided to have 2 day(s) of safety stock One container fits 350 units How many kanban containers will be needed to support this system? (Round up to next whole number). containers
You are asked to analyze the kanban system of LeWin, a French manufacturer of gaming devices. One of the workstations feeding the assembly line produces part M670N. The daily demand for M670N is 1,750 units. The average processing time per unit is 0.005 day. LeWin's records show that the average container spends 1.100 days waiting at the feeder workstation. The container for M670N can hold 400 units. 16 containers are authorized for the part. Recall that is the average processing...
A manufacturing assembly line has a demand for specific part of 1,200 parts per eight-hour day. It wants to design a lean system using containers. It takes about four hours to round-trip a container from one work center to the next and back again. It also wants to hold 10% safety stock of this part in its system. a) Design a container system. State each container's size and how many are needed. b) Calculate the maximum system inventory for this...
Lady Bug Machineries uses a lean production assembly line to make its generators. In one assembly area, the demand is 200 parts per 8-hour day. It uses a container that holds 10 parts. It typically takes about 5 hours to round-trip a container from one work center to the next and back again. They also desire to hold a 20% safety stock of this part in the system. Based on the required safety stock of zero and the number of...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC boand assembly operation, a number。individuals are esponsible for assenting electronic components into pn te i ut boards. Each operator s es ons le r so den g e net erdg to a given set of instructions. Operators work on batches of s0 printed dircuit boards. Each board requires 4 minutes of board assembly time. After each...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost Daily production Annual demand Desired lot size $20 per hour $12 per unit 976 units/8 hour day 25,300 (275 days each x daily...
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator...
Bradley's Copiers sells and repairs photocopy machines. The manager needs weekly forecasts of service calls so that he can schedule service personnel. Use the actual demand in the first period for the forecast for the first week so error measurement begins in the second week. The manager uses exponential smoothing with α- 0.4. Forecast the number of calls for week 6, which is next week. Week Actual Service Calls 28 34 3 38 4 23 25 5 The forecast for...