What is the benefit of identifying non-value added activity? How is setup time and lead time...

What is the benefit of identifying non-value added activity? How is setup time and lead time important in a just-in-time environment?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Non Value added activities are those which does not add value but are relevant to control following things:-

1.Defects in production

2. Overproduction

3. Waiting time between production processes.

4.Under utilization of manpower

5. Unnecessary transportation costs

6. Unnecessary movements by people.

Significance of set up time and lead time in just in time environment

Just in time is a process by which items are created to meet demand and no surplus is kept. In crux, it focuses on minimum wastage in production, waiting and excess inventory.

Hence, to survive in just in time model, organization need to have minimum set up time and lead time, otherwise, organization will not be able to fulfill the demand and Just in time model will fail.

Please hit like and in case of doubt please comment.

Add a comment
Know the answer?
Add Answer to:
What is the benefit of identifying non-value added activity? How is setup time and lead time...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Varianc...

    Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made machine parts. Maquina recently has implemented an activity-based management (ABM) system with the objective of reducing costs. Maquina has begun analyzing each activity to determine ways to increase its efficiency. Setting up equipment was among the first group of activities to be carefully studied. The study revealed that setup hours was a good driver for the activity. During the last year, the company incurred...

  • Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Varianc...

    Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made machine parts. Maquina recently has implemented an activity-based management (ABM) system with the objective of reducing costs. Maquina has begun analyzing each activity to determine ways to increase its efficiency. Setting up equipment was among the first group of activities to be carefully studied. The study revealed that setup hours was a good driver for the activity. During the last year, the company incurred...

  • Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company pro...

    Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made machine parts. Maquina recently has implemented an activity-based management (ABM) system with the objective of reducing costs. Maquina has begun analyzing each activity to determine ways to increase its efficiency. Setting up equipment was among the first group of activities to be carefully studied. The study revealed that setup hours was a good driver for the activity. During the last year, the company incurred...

  • Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made...

    Calculation of Value-Added and Non-Value-Added Costs, Activity Volume and Unused Capacity Variances Maquina Company produces custom-made machine parts. Maquina recently has implemented an activity-based management (ABM) system with the objective of reducing costs. Maquina has begun analyzing each activity to determine ways to increase its efficiency. Setting up equipment was among the first group of activities to be carefully studied. The study revealed that setup hours was a good driver for the activity. During the last year, the company incurred...

  • Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...

    Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). C. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection, 1. It takes 48 minutes and five pounds of material...

  • Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...

    Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). c. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection. Choose "Multiple" in the Root cause column, wherever there is...

  • Cost Report, Value Added and Non-Value Added Costs Sanford, Inc., has developed value-added standards for four...

    Cost Report, Value Added and Non-Value Added Costs Sanford, Inc., has developed value-added standards for four activities: purchasing parts, receiving parts, moving parts, and setting up equipment. The activities, the activity drivers, the standard and actual quantities, and the price standards for 20x1 are as follows: Activities Activity Driver Purchasing parts Receiving parts Purchase orders Receiving orders Number of moves Setup hours SQ AQ SP 3,100 4,570 $255 6,200 8,500 245 0 2,700 380 0 9,500395 Moving parts Setting up...

  • either value-added or non–value-added.

    Anna Bellatorre Inc. is interested in using its activity-based costing system to improve its operating efficiency and its profit margins by applying activity-based management techniques. As part of this undertaking, you have been asked to classify its plant activities as value-added or non–value-added.Using the list of activities below, classify each activity as either value-added or non–value-added.(a)Designing new models  Non-value addedValue-added(b)Purchasing raw materials and parts  Value-addedNon-value added(c)Storing and managing inventory  Value-addedNon-value added(d)Receiving and inspecting raw materials and parts  Non-value addedValue-added(e)Interviewing and hiring new personnel  Value-addedNon-value added(f)Machine...

  • Lead Time Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed...

    Lead Time Lead Time Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch...

  • Cost of Quality and Value-Added/Non -Value-Added Reports for a Service Company Three Rivers Inc. provides cable TV and Internet service to the local community. The activities and activity...

    Cost of Quality and Value-Added/Non -Value-Added Reports for a Service Company Three Rivers Inc. provides cable TV and Internet service to the local community. The activities and activity costs of Three Rivers are identified as follows: a. Identify the cost of quality classification for each activity and whether the activity is value-added or non-value-added. Value-Added / Activity Quality Cost Non-Value-Added Quality Control Activities Cost Classification Classification Billing error correction $24,500 Cable signal testing 91,800 Reinstalling service (installed incorrectly the first...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
Active Questions
ADVERTISEMENT