Suppose that Brooke is a manufacturing plant supervisor, and she is considering whether a new machine will pack items faster than their current machine. She selects independent simple random samples of packing times, in seconds, from both machines, summarized in the table. Population Population description Population mean Sample size Sample mean (s) Sample standard deviation (s) 1 New Machine ?1 (unknown) ?1=20 ?⎯⎯⎯1=45.231 ?1=0.797 2 Current Machine ?2 (unknown) ?2=18 ?⎯⎯⎯2=43.683 ?2=0.674 Brooke then formulates the following null and alternative hypotheses to reflect her belief that the new machine works faster than the current machine. ?0:?1?1:?1=?2>?2 Calculate the standard error estimate, SE, of the difference between the mean packing times of the two machines. Then calculate the value of the two-sample ? ‑statistic for this hypothesis test. Give your answer for the standard error rounded to five decimal places and your answer for the ? ‑statistic rounded to three decimal places. ?= SE =

0 0
Add a comment Improve this question Transcribed image text
Answer #1

The statistical software output for this problem is:

Hence,

t = 6.43

SE = 0.24090

Add a comment
Know the answer?
Add Answer to:
Suppose that Brooke is a manufacturing plant supervisor, and she is considering whether a new machine...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • In a packing plant, one of the machines packs jars into a box. A sales rep...

    In a packing plant, one of the machines packs jars into a box. A sales rep for a packing machine manufacturer comes into the plant saying that a new machine he is selling will pack the jars faster than the old machine. To test this claim, each machine is timed for how long it takes to pack 10 cartons of jars at randomly chosen times. Given a 95% confidence interval of (-8.73, -2.65) for the true difference in average times...

  • 4. In a packing plant, a machine packs cartons with jars. It is supposed that a...

    4. In a packing plant, a machine packs cartons with jars. It is supposed that a new machine will pack faster on the average than the machine currently used. To test that hypothesis, the times it takes each machine to pack ten cartons are recorded. The results (machine.txt), in seconds, are shown in the following table. Each sample includes 10 observations New machine 42.1 41.3 | 41.0 41.8 Old machine 42.7 43.8 43. 6 433 43. 1 44.0 42.5 43.5...

  • DATA ANALYSIS FOR SYSTEMS ENGINEERING Q / A packing plant purchases a new machine for wrapping...

    DATA ANALYSIS FOR SYSTEMS ENGINEERING Q / A packing plant purchases a new machine for wrapping jar. The new machine is expected to work faster than the older machines. To test this hypothesis, the working time for each machine to pack ten boxes were recorded. Results in seconds are shown in Table 1a below. Assume the variances are equal. 1. Perform a hypothesis test (6-steps procedure) at 5% significant and declare your decision. 2. Confirm the calculation by using Minitab...

  • Problem 1: See Dataset HIFA19Q1 .mtx In a packing plant, a machine packs cartons with jars....

    Problem 1: See Dataset HIFA19Q1 .mtx In a packing plant, a machine packs cartons with jars. It is supposed that a new machine will pack faster on the average than the machine currently used. To investigate this issue, the times it takes each machine to pack forty cartons, twenty each, are recorded. Conduct different types of descriptive analysis of the data of this experiment as outlines in the questions below: 1. Use a suitable graphical method to compare the packing...

  • A new operating system is installed in every workstation at a large company. The claim of...

    A new operating system is installed in every workstation at a large company. The claim of the operating system manufacturer is that the time to shut down and turn on the machine will be much faster. To test it an employee selects 32 machines and tests the combined shut down and restart time of each machine before and after the new operating system has been installed. The mean of the differences (beforeminus− after) is 22.9 seconds with a standard deviation...

  • 1.The owner of a golf course wants to determine if his golf course is more difficult...

    1.The owner of a golf course wants to determine if his golf course is more difficult than the one his friend owns. He has 8 golfers play a round of 18 holes on his golf course and records their scores. Later that week, he has the same 8 golfers play a round of golf on his friend's course and records their scores again. The average difference in the scores (treated as the scores on his course - the scores on...

  • Sheer industries is considering a new computer-assisted program to train maintenance employees to do machine repairs....

    Sheer industries is considering a new computer-assisted program to train maintenance employees to do machine repairs. In order to fully evaluate the program, the director of manufacturing requested an estimate of the population mean time required for maintenance employees to complete the computer assisted training. Use 8.74 days as a planning value for the population standard deviation. (Round your answers up to the nearest whole number.) (a) Assuming 95% confidence, what sample size would be required to obtain a margin...

  • A systems analyst tests a new algorithm designed to work faster than the currently-used algorithm. Each algorithm is applied to a group of 47sample problems. The new algorithm completes the sample pro...

    A systems analyst tests a new algorithm designed to work faster than the currently-used algorithm. Each algorithm is applied to a group of 47sample problems. The new algorithm completes the sample problems with a mean time of 14.75 hours. The current algorithm completes the sample problems with a mean time of 16.77 hours. Assume the population standard deviation for the new algorithm is 3.956 hours, while the current algorithm has a population standard deviation of 5.135 hours. Conduct a hypothesis...

  • A manufacturer of chocolate chips would like to know whether its bag filling machine works correctly...

    A manufacturer of chocolate chips would like to know whether its bag filling machine works correctly at the 427 gram setting. It is believed that the machine is underfilling the bags. A 26 bag sample had a mean of 421 grams with a standard deviation of 20. Assume the population is normally distributed. A level of significance of 0.02 will be used. Find the P-value of the test statistic. You may write the P-value as a range using interval notation,...

  • A systems analyst tests a new algorithm designed to work faster than the currently-used algorithm. Each...

    A systems analyst tests a new algorithm designed to work faster than the currently-used algorithm. Each algorithm is applied to a group of 3333 sample problems. The new algorithm completes the sample problems with a mean time of 24.0524.05 hours. The current algorithm completes the sample problems with a mean time of 27.0127.01 hours. Assume the population standard deviation for the new algorithm is 5.3295.329 hours, while the current algorithm has a population standard deviation of 3.0783.078 hours. Conduct a...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT