please answer and thoroughly explain the question ( I am more interested in UNDERSTANDING how to solve the question) A small excavating company owns the following Excavator Tvpe CAT 330CCAT 365B Number of Excavators Bucket Size Excavator Cvcle Time Excavator Cost 2 1.25 с 18 sec 2 0.7 10 sec $215.00/hr $250.00/hr Available Trucks Truck Capacit HDRM 8 18 12 min Truck Cost $90.00/hr Efficiency Hour 50 min CAT 615 CAT 621 Scraper Type Scraper Capacit Scrapers Available 17 cy...
please solve how this comes true. A small excavating company owns the following Excavator Tvpe CAT 330C CAT 365B Number of Excavators 2 1.25 c 18 sec 2 0.7 10 sec Bucket Size Excavator Cycle Time Excavator Cost $215.00/hr |$250.00/hr Available Trucks 18 12 min Truck Capaci HDRM Truck Cost $90.00/hr Efficiency Hour 50 min Scraper Tvpe Scraper Capaci Scrapers Available Scraper Cost Spot Time Load Time Maneuver and Dump Time Haul & Return Time Available Dozers Dozer Cost Efficiency...
please answer and thoroughly explain the question ( I am more interested in UNDERSTANDING how to solve the question) Solve question #6 2. 30 cubic yard scrapers are being loaded by a dozer. The scrapers cost $275/hr and have a Haul-Return cycle of 4.3 minutes. The dozer cost is $145/hr and has a spot time of 0.3 minutes and a load time of 0.6 minutes. Using a Maneuver and Dump time of 0.7 minutes and a 45 minute efficiency hour,...
please answer and thoroughly explain the question ( I am more interested in UNDERSTANDING how to solve the question) Solve question #7 3. Scrapers and a dozer are being used to haul dirt on a jobsite. The scrapers hold 38 cubic yards each. The scrapers cost 305/hr and have a Haul-Return cycle of 6.3 minutes. The dozer cost is $125/hr and has a spot time of 15 seconds and a load time of 25 seconds. Using a Maneuver and Dump...
Correct answer is 238 cy/hr. How do I get this? A contractor has a project involving the construction of a small manufacturing plant. The contractor has selected a borrow site and has decided to use 27-cubic yard dump trucks to haul the needed fill material. The contractor has decided to use a hydraulic excavator with a shovel attachment to load the trucks. The excavator has expected productivity as 422cy/hr at 100% efficiency, and the truck cycle time excluding loading is...
(50) 7. Analyze the following operation. A 385C Excavator will be used to load material into a CAT 740 (no ejector) articulated truck. The excavator is equipped with a 6 cy heaped bucket and is capable of cycling every 30 seconds. The material being loaded weighs 3,300 lbs cy. The job efficiency is 90%. The trucks will be hauling the nmaterial 4000 feet over a road with a total rolling resistance of 9% to the dumpsite and 10% total rolling...
Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...
Part 1 Complete the following Earthwork Sheet Material: Earth and Gravel, Swell Factor: 83 Strip fill(cy Total till och Total cut beyl Adj fill (byl Sum (beyl Mass ordinate 1.23 056 2.37 1.20 2.36 3.07 3.60 3.77 3.09 3.01 4.65 Strip cut (boyil 0.04 1.04 097 3.22 2.08 2.33 2.51 1.85 161 1.74 0.88 109 35.70 5.58 18 3.12 2.03 6.77 2.01 2.53 0.82 1.08 1.20 1.92 1.59 1.82 3.95 3.25 2.74 150 7.42 556 80 End-area End area cut...
please I am having a lot of problems with the questions above .I am getting ready for the final this week.Can you please answer all of them . Tab 07) How many of the following events would require an expense to be recorded? Ordering office supplies Hiring a receptionist Paying employces' salaries for the current month Receiving but not paying a current utility bill Paying for insurance in advance A) One D)Iwo. C) Three. B) Four 08) The balance sheet...
please urgent help needed lakt time measure which b. I Discussion Questions ( Why Is It portant to look a formance, as measured by average Inventory avera e gate flow pe flow time, and average throughput? 3.2 Discuss why it is often easier to measure average inventory and average throughput rather than aver- age flow time How can a manager determine the minimal set of operational measures that should be tracked on a daily basis to predict the financial performances...