4. Force on a Faucet (20 points) Water issues from a pipe embedded in a concrete wall as shown in...
A jet of water impacts a flat plane oriented at an angle as shown. The flow is in the horizontal xy plane. The cross-sectional area of the jet is 1.7 in2 and the velocity is 16 ft/s. The angle θ is 67°. Assume negligible friction. This assumption lets you (1) use the Bernoulli equation to determine v2 and v3, and (2) determine the direction of the force apriori (no friction means no shear along the surface of the plate): (a)...
Show all steps clearly 12 in 5.35. Water issues through a horizontal 180° pipe bend as shown in Figure P5.35. The pipe has the same diameter, 12 in, before and after the bend and the velocity through the bend is 10 ft/s. The pressures at the entrance and exist of the bend are 12 psi and 10 psi, respectively. Calculate the horizontal (x and y) components of the force exerted by the bend on the flowing water. Figure P5.35 Water...
5. (20 points) The truss shown below supports horizontal forces of 6 kips at Joint G, 8 kips at Joint E, and 4 kips at Joint C. All truss members are made of steel (E 29,000 ksi). Each of the diagonal members (Members AD, DE, and EH) has a cross-sectional area of 1.2 in2. Each of the vertical members (Members AC, CE, EG, BD, DF and FH) has a cross-sectional area of 2.4 in Each of the horizontal members (Members...
Water flows through the pipe bend and nozzle arrangement shown in the figure above, which lies with its axis in the horizontal -y plane. The water issues from the nozzle into the atmosphere as a jet with a velocity VN - 13 m/s and the pressure at Ais PA - 179 kPa Find the moment of the resultant force about a vertical axis through the point X for D = 6 cm diameter, Ly - 30 cm 19 cm and...
4. An old, rough-surfaced, 2-m-diameter concrete pipe with a Manning coefficient of 0.025 carries water at a rate of 5.0 m'/s when it is half ful. This pipe is to be replaced by a new smooth pipe with a Manning coefficient of 0.012. Determine the diameter of the new pipe if it also is to flow half full with a flow rate of 5.0 m'/s Water initially flowing in the horizontal section of pipe of diameter 12.00 cm shown in...
QUESTION 1 Water at 10 °C is flowing in a 90 bend pipe, with inner diameter of 150 mm, at an average velocity of 3.0 m/s and gauge pressure of 300 kPa. The pipe is laid in the horizontal plane as shown in figure below. The magnitude of the resultant (horizontal) force required to hold the bend in place is: a 5.46 kN b.7.72 kN Oc 10.92 kN d.5.15 kN . None of the other answers QUESTION 2 A 25.0...
Water is flowing through a horizontal pipe with diameter, D1, at a velocity, V1, and under a pressure, P1. It enters a 900 reducing bend (Shown in grey in Fig 2) that connects to a vertical pipe of diameter, D2. The inlet of the bend is 50 cm above the exit of the bend (as shown in Fig 2). Axes for positive directions of x and z coordinates are provided. Figure 2 Side view of reducing bend from horizontal to...
Question 3 [20 marks] Water (density p1000 kg/m2; dynamic viscosity 0.001 Pa-s) flows steadily through a horizontal, straight pipe with circular cross section of diameter D=0.2 m. The volumetric flow rate is 0.01 m°/s. Argue that this is turbulent flow. [4 marksl а. Pressure drop in the pipe is due to friction. The pressure drop per unit length can be written as Др 4f L with U the average velocity in the pipe and fthe friction factor. Given the pipe...
Part 1 water flows through a ho zon a pipe bend asisillustrated in th gure below. The flow cross sect on area is constant at a value of gDao mm2 respectively. Calculate the horizontal (x and v) components of the anchoring farce needed to hold the bend in place ) compoes af the The flow velocity ถverywhere n the bend is 15 m s. The pressures at the cntrance and exit o the band are 210 and 159 the bend...
Problem 4 (50 points) water is discharged from a reservoir at a rate of 18.103 m2/s using two horizontal cast iron pipes nected in series and a pump between them. The first pipe is 20 m long and has a 6-cm diameter, while the second pipe is 35 m long and has a 4-cm diameter. The water level in the reservoir is 30 m above the centerline of the pipe. The pipe entrance is sharp-edged. Losses associated with the connection...