Question

4. Based on the following information: VPI: Sta: 87+25.00 Elev: 115.78 ft gi-3.5% Obstruction: Sta: 90+35.00 Elev: 152.39 ft
0 0
Add a comment Improve this question Transcribed image text
Answer #1

roo IST,30 set Elevahon the Curve olytru ctim ahan EvC (82425) toy 97+4O 2 L Elevahiom 一3: S ( 늘+310 132-39 6-3 883.22 ILI- 2

Add a comment
Know the answer?
Add Answer to:
4. Based on the following information: VPI: Sta: 87+25.00 Elev: 115.78 ft gi-3.5% Obstruction: St...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • CM208 CONSTRUCTION SITE SURVEYING HW #6 (100pts) 1. Based on the following information: A (N1200.00, E1850.00)...

    CM208 CONSTRUCTION SITE SURVEYING HW #6 (100pts) 1. Based on the following information: A (N1200.00, E1850.00) B (N2100.00, E2875.00) C (N1900.00, E4000.00) Find the radius (R) of the circular are passing through points ABC. (20pts) Find the coordinates of the center (O). (10pts) 2. Based on the following information: A (N350.00, E450.00) B (N875.00, E850.00) C(N1100.00, E200.00) Evaluate the bearings and distances of traverse ABC. (20pts) 3. Based on the following information: L=7 stations BVC EVC -1.5% +2.0% PVI Sta:...

  • 6. Based on the following Vertical Curve information (units in ft.): PVi Sta. 22+00, PVI Elev.-...

    6. Based on the following Vertical Curve information (units in ft.): PVi Sta. 22+00, PVI Elev.- 1 134.50, gi-30%, g2+ +1.4%, L :300, what is the station and elevation of the BVC? a) 17+00; 1138.00 17+00; 1139.44 h9+50; 1142.00 d) 19+50; 1138.00 7. Based on the following Vertical Curve information (units in ft.): PVI Sta 1 134.50, gi .-30%, g2+ +1.4%, L . 500, what is the elevation on the curve at Sta. 23 22+00, PVI Elev. a) 1138.49 b)...

  • Problem 4 A 500 ft long sag vertical curve passes under a bridge at station 82+45....

    Problem 4 A 500 ft long sag vertical curve passes under a bridge at station 82+45. The beginning of vertical curve (BVC) is at station 81+00. A-3.6% curve meets a +4.4% curve at the point of vertical intersection (PVI), which is at elevation 425.38 ft. What is the elevation of the point on the curve under the bridge? Problem 5 The grade into a vertical sag curve is -2%. The curve length is 1,400 ft. The grade out of the...

  • Part 3 of 4 Required information (The following information applies to the questions displayed below.] Dain's...

    Part 3 of 4 Required information (The following information applies to the questions displayed below.] Dain's Diamond Bit Drilling purchased the following assets this year. points Skipped Asset Drill bits (5-year) Drill bits (5-year) Commercial building Purchase Date January 25 July 25 April 22 Original Basis $ 90,000 95,000 220,000 eBook Print References Assume its taxable income for the year was $53,000 for purposes of computing the $179 expense (assume no bonus depreciation). (Use MACRS Table 1. Table 2, Table...

  • Required information (The following information applies to the questions displayed below.) points Skippe...

    Required information (The following information applies to the questions displayed below.) points Skipped Assume that TDW Corporation (calendar-year-end) has 2019 taxable income of $650,000 for purposes of computing the $179 expense. The company acquired the following assets during 2019: (Use MACRS Table 1, Table 2, Table 3. Table 4 and Table 5.) eBook Print References Asset Machinery Computer equipment Furniture Total Placed in Service September 12 February 10 April 2 Basis $2,270,000 263,000 880,000 $3,413,000 a. What is the maximum...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT