A 140 Motor Grader will be used to maintain a 1,700 ft haul road. It is estimated that this work will require 1 passes in second gear and 3 passes in third gear. Use an efficiency factor of 85%. Grader speeds are given in the chart below. The cost per hour for the grader with an operator is $178 per hour. How much time in minutes is required to perform this task? Round to the nearest whole minute.
A 140 Motor Grader will be used to maintain a 1,700 ft haul road. It is estimated that this work will require 1 passes in second gear and 3 passes in third gear. Use an efficiency factor of 85%. Grade...
Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...