with the stress calculated in the portion 3 we can draw the Mohr's circle . Only critical points need to be considered . Here point O and B need to be considered.
A better way to design these things are by using hollow shafts . Whenever direct stress is not too large and we have to design for rigidity criterion we would like to concentrate more mass away from neutral axis . So that I or J value comes larger with less material consumption.
please help me with the shear, moment and torque diagrams and the Mohr’s circle also, is this project worth insuring? Thank you. A consulting company submitted a structural design project and...
please include free body diagrams shear, moment, and torque diagrams Detail stress calculations Mohr’s circle A consulting company submitted a structural design project and they want to be insured by XYZ Insurance Company. XYZ Insurance Company then ask their internal Engineering department to do an engineering analysis to check if the project is worth insuring. Your team has been tasked to perform all acceptable engineering analyses, and most importantly to come up with the acceptable diameter of the pipe. The...