question was answered QUESTION 5 Wh en planning a project there are several key points that must be considered. A bar chart based on the work breakdown structure (WBS) of a plant is a very clea...
QUESTION 5 When planning a project there are several key points that must be considered. A bar chart based on the work breakdown structure (WBS) of a plant is a very clear means of presenting a programme of work. Draw a bar chart and a resource chart derived from the bar chart showing all salient values. [14] QUESTION 5 When planning a project there are several key points that must be considered. A bar chart based on the work breakdown...
When planning a project there are several key points that must be considered. A bar chart based on the work breakdown structure (WBS) of a plant is a very clear means of presenting a programme of work. Draw a bar chart and a resource chart derived from the bar chart showing all salient values.
Please assit with MMN101M questions? 2 Considering the performance standards of an asset. disouss the difference b desired performance of an asset and it's built in capacity. Give a practical exampi different from the ones given in your lext book between the QUESTION 2 Thea des the failures which are not age related co(81 Bired performance of any asset wil deteriorate with age, due to several factors. Discuss QUESTIONS Mean time between falures (MTBF) is the predicted elapsed time between...
considering the perfomance standards of an asset, discuss the difference between the desired perfomance of an asset and its built in capacity. MMN101M/101/0/2019 1.2 Considering the performance standards of an asset, discuss the difference between the desired performance of an asset and it's built in capacity. Give a practical example, different from the ones given in your text book. QUESTION 2 n 140 Thea desired performance of any asset will deteriorate with age, due to several factors. Discus the failures...